Civil input to gps iii
This presentation is the property of its rightful owner.
Sponsored Links
1 / 15

Civil Input to GPS III PowerPoint PPT Presentation


  • 77 Views
  • Uploaded on
  • Presentation posted in: General

Civil Input to GPS III. PNT Advisory Board Meeting 16 Oct 08. HQ AFSPC Mr. Hank Skalski, OST Col Dave Buckman, A5P Peterson AFB, CO. Overview. Purpose Interagency Requirements Process (IRP) Nominal IFOR Approval Cycle Overall Approval Process GPS IIIB CDD Schedule

Download Presentation

Civil Input to GPS III

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Civil input to gps iii

Civil InputtoGPS III

PNT Advisory Board Meeting

16 Oct 08

HQ AFSPC

Mr. Hank Skalski, OST

Col Dave Buckman, A5P

Peterson AFB, CO


Overview

Overview

  • Purpose

  • Interagency Requirements Process (IRP)

  • Nominal IFOR Approval Cycle

  • Overall Approval Process

  • GPS IIIB CDD Schedule

  • Geodetic Requirement (Satellite Laser Reflectors [SLRs])

  • Distress Alerting Satellite System (DASS)

  • Wrap Up


Purpose

Purpose

  • Describe GPS interagency requirements process

  • Provide information on candidate GPS requirements/payloads

    • Geodetic

    • DASS


Interagency requirements process

Interagency Requirements Process

Validated

Civil

Requirements

Validated

Interagency

Requirements

Validated

Military

Requirements

DOT

Extended

Pos/Nav

ExCom

Approve Civil

Requirements

Interagency

Requirements

Oversight

Council

(IROC)

JROC

Approve Military

Requirements

JCB

Coordinate and

Adjudicate Military

Requirements

Interagency

Requirements

Board

(IRB)

DOT

Extended

Pos/Nav WG

NC FCB

Coordinate and

Adjudicate Military

Requirements

Interagency Forum

for Operational

Requirements (IFOR)

CivilDepartment

Requirements

Processes

Service’s &

Defense Agency

Requirements

Processes

Military Panel

Civil Panel


Nominal ifor approval cycle

Nominal IFOR Approval Cycle

Incorporate into GPS Req’ts Documents

Send to IFOR

For Review

Receive

Req’t & AoA

Prepare Package for Co-Chairs

Approve or Send for Rework

Resolve

Comments

Day 105

Day 0

Days 1-60

Days 61-90

Days 91-104

Dependent on Req’t Cycle

Enter

JCIDS

Process

  • Nominal Cycle Time is 105 days plus time

    associated with preparing documents

  • Following document preparation, requirement

    documents (such as CDDs) will enter JCIDS process


Overall approval process

Overall Approval Process


Gps iiib cdd schedule

GPS IIIB CDD Schedule


New requirements geodetic

New Requirements - Geodetic

  • Geodetic Requirements

    • Achieve a stable geodetic reference frame with an accuracy at least ten times better than anticipated user requirements

    • Maintain a close alignment of the WGS84 reference frame with the International Terrestrial Reference Frame

    • Provide a quality assessment capability independent of current radiometric measurement used to determine GPS orbits and clock performance

    • Ensure interoperability of GPS with other GNSSs through a common, independent measurement technique


Geodetic requirements status

Geodetic Requirements – Status

  • Requirements and AoA submitted to IFOR - Apr 07

    • One GPS-based alternative (Satellite Laser Reflectors) with other non-GPS alternatives

  • Sent out for review Apr 07

    • No critical/substantive comments received

    • Many favorable comments received

  • IFOR letter to NASA approving Geodetic Requirements for inclusion in GPS IIIB CDD prior to entering JCIDS process – Aug 07

    • GPSW analysis had not been accomplished

  • IFOR Requested GPSW review for GPS III satellite impacts

    • White papers provided in Jun 08 opposing implementation on SVs, but also provided possible solutions

  • Geodetic Requirements Working Group chartered by IFOR


Geodetic requirements working group

Geodetic Requirements Working Group

  • Intent is to fully explore all security, cost, and technical issues prior to entering the JCIDS process

  • First meeting held 17 July 08

    • Attended by representatives from NASA, USGS, NRL, NGA, DOT, USNO, SAF/USA, AF/A5R, GPSW, AFTAC and AFSPC/A5P

    • Created roadmap to resolve issues

  • Additional Technical Meeting held 26 Aug 08 to further explore technical issues

  • Next meeting – Nov 08


Geodetic approval cycle

Geodetic Approval Cycle

Prepare Package for Co-Chairs

Approve or Send for Rework

Approved

for IIIB

CDD

Send to IFOR

For Review

Receive

Req’t & AoA

Comment

Resolution

GPSW Analysis &

Comment Resolution

Enter

JCIDS

Process

  • Requirements submitted Apr 07

  • IFOR approval Aug 07

    • Did not include GPSW analysis

  • GPSW analysis provided Jun 08

  • Currently working identified technical issues

  • Anticipated completion 1 Dec 08


Distress alerting satellite system dass

Distress Alerting Satellite System (DASS)

  • The United States Government, specifically the U.S. Coast Guard, Department of Defense, and the National Oceanic and Atmospheric Administration, requires an enduring space-based capability to detect, locate, and relay distress alerts from emergency beacons carried by aviators, mariners and land-based users to search and rescue services.

  • The federal government requires a capability:

    • To support the general public

    • To support civilian SAR efforts of the USCG and DoD worldwide

    • To support military SAR operations worldwide

    • To meet international obligations under the Chicago Convention


Dass status

DASS – Status

  • Requirements and AoA received 28 Jul 08

    • Not a GPS or PNT requirement – would be a secondary payload

  • Package sent out for IFOR review 1 Aug 08, comments due 1 Oct 08

    • Letter supporting requirements received from Joint Personnel Recovery Agency

    • Comments received and being adjudicated

  • GPSW performing cost and technical analysis

  • USAF Red Team conducting national security analysis


Dass approval cycle

DASS Approval Cycle

Send to IFOR

for Review

Receive

Req’t & AoA

Prepare Package for Co-Chairs

Approve or Send for Rework

Approved

for IIIB

CDD

Comment

Resolution

Day 105

Day 0

Days 61-90

Days 91-104

Days 1-60

Enter

JCIDS

Process

Task GPSW for Analysis

  • Requirements and AoA received Jul 08

  • Comments received Oct 08

  • In Comment Resolution

  • GPSW still conducting cost/technical analysis

  • Anticipated completion Dec 08


Wrap up

Wrap Up

  • Flexibility in the requirements development process is key – one size doesn’t fit all

  • Geodetic and DASS requirements are being processed through the IFOR

    • Each has unique issues that require slightly different handling