An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SW 20th Ave. 4-Laning Bridge over I-75(SW 61st Street to SW 62nd Blvd) Alachua County BoCC Meeting November 8, 2011

  2. Outline • Project Background and Location • Study Purpose • Study Activities • Bridge Alternatives Evaluation • Schedule

  3. Project Location

  4. Project Background • Identified as a needed project in 2005 Tower Road Network Study. • Identified as major project need in the recently adopted Mobility Plan. • Design funded with $540,000 of Transportation Trust Fund.

  5. Study Purpose • Determine need to improve safety and add capacity on SW 20th Ave. from SW 61st St. to SW 62nd Ave. • Based upon the established need develop alternatives to satisfy the need. • Evaluate identified alternatives relative to environmental impacts and costs. • Submit Draft Project Development Summary Report (PDSR) to FDOT for review and comment.

  6. Study Purpose • Present to the BoCC the PDSR with the identified alternatives. • Conduct a Alternatives Public Meeting to solicit public comment on identified alternatives. • Present to the BoCC and MTPO. • Hold a public hearing to present the preferred alternative. • Finalize study recommendations and secure FDOT approval.

  7. Study Activities • Conduct deficiency analysis • Develop project purpose and need • Develop alternatives • Conduct environmental evaluation of alternatives • Develop costs • Conduct comparative analysis • Develop Draft Project Development Summary Report (PDSR)

  8. Bridge Alternatives Evaluation • Bridge Alternatives Evaluation • No-build alternative will be carried through completion of the study • Four bridge build alternatives considered • Restripe existing bridge and construct a new parallel multi-use path bridge • Widen the existing bridge • Construct a new parallel vehicular bridge • Replace the existing bridge with a completely new bridge

  9. Schedule • Present to the BoCC the PDSR with the identified alternatives. (Spring 2012) • Conduct Alternatives Public Meeting (Spring 2012) • Select preferred alternative (Summer 2012) • Conduct Public Hearing (Summer 2012) • Develop Final PDSR (Fall 2012) • Secure FDOT approval (Fall 2012)

  10. Questions ?