Agenda
This presentation is the property of its rightful owner.
Sponsored Links
1 / 11

Status of Magnets and financial orders (including RPC) Mario Spinetti15’ PowerPoint PPT Presentation


  • 60 Views
  • Uploaded on
  • Presentation posted in: General

Agenda. Status of Magnets and financial orders (including RPC) Mario Spinetti15’ Status of RPC (including Mechanics, Strips and FE electronics) Luca Stanco15’ Status System Test at LNGS Carlo Gustavino20’ RPC production at GT and Automatic Pushing Test

Download Presentation

Status of Magnets and financial orders (including RPC) Mario Spinetti15’

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Status of magnets and financial orders including rpc mario spinetti 15

Agenda

  • Status of Magnets and financial orders (including RPC)

  • Mario Spinetti15’

  • Status of RPC (including Mechanics, Strips and FE electronics)

  • Luca Stanco15’

  • Status System Test at LNGS

  • Carlo Gustavino20’

  • RPC production at GT and Automatic Pushing Test

  • Alberto Garfagnini20’

  • First developments of DAQ/Trigger for RPC

  • Adele Di Cicco15’

  • Results of RPC under tests at LNGS

  • Alessandro Paoloni20’

  • Status of RPC test at CERN

  • Stefano Dusini10’

  • Status of Drift Tubes

  • Raoul Zimmermann30’

Luca Stanco - Padova


Status of magnets and financial orders including rpc mario spinetti 15

RPC

Status Report

  • Mechanics

  • Strips

  • Situation on Production

  • System Test Facility

  • Automatic tests on RPC

  • Electronics

  • FE – DAQ

  • RPC under tests at LNGS and Cern

Luca Stanco - Padova


Status of magnets and financial orders including rpc mario spinetti 15

MECHANICS

  • frame and “culla” for installation here at LNF !

  • to be checked on the magnet prototype next

  • 5+5 transportation boxes ordered.

Luca Stanco - Padova


Status of magnets and financial orders including rpc mario spinetti 15

Luca Stanco - Padova


Status of magnets and financial orders including rpc mario spinetti 15

Luca Stanco - Padova


Status of magnets and financial orders including rpc mario spinetti 15

Luca Stanco - Padova


Status of magnets and financial orders including rpc mario spinetti 15

STRIPS

  • Final design reached (2.6 cm pitch in x-view, 3.5 cm pitch in y-view)

  • Full double layer (x any view) (final) prototype ordered at Pol.Hi.Tech

  • To be ready in November

  • To be tested at LNF in December

  • Started procedure for tendering to be ended in January-February 2003

Luca Stanco - Padova


Status of magnets and financial orders including rpc mario spinetti 15

RPC PRODUCTION

  • Production plan for OPERA: October 1rst

  • Delayed 1 month in cooperation with ARGO  November 4th

  • Bakelite planes ready at PanPla company. To be sent to General Technica (this week)

500 chambers are necessary for one Spectrometer

Each Spectrometer has to be installed, together with RPC’s in 6 months

Luca Stanco - Padova


Status of magnets and financial orders including rpc mario spinetti 15

ELECTRONICS

Front-End card (2nd prototype):

- 64 channels (final, 16 ch for prototype)

- differential receivers exaustively studied (good response until 5 mV)

- Zin = 100 

- input polarization for at least two samples

- threshold tunable 0 – 300 mV for groups of 16 channels

- mask single input

- digital test-in

- FastOR over 16 channels 1 ms long, TTL output at 50 

- generation of interrupt on the FastOR

- external trigger/gate for all the channel. TTL output at high Z

- double buffer for the events

- VME-like read-out

… under test with RPC in Padova

Luca Stanco - Padova


Status of magnets and financial orders including rpc mario spinetti 15

FE 64 channels card:

- final design under going

Backplane:

- for Eurocrate 6U

- 19 FE cards of 64 channels each

- in the 2 free positions a power supply “switching”-like

250 W, +3.3 V, +5 V, ±12 V, standard PCI

…offers from company on the way

…possibility to build the prototype in Padova under investigation

Strip-connectors-FE-cards:

- Impedence adapters

- under definition at LNF

Cabling:

- ready to buy

High Voltage system:

- under development at LNF

Luca Stanco - Padova


Status of magnets and financial orders including rpc mario spinetti 15

Summary

of June 2002 …

… at October 2002

  • System test at Gran Sasso very well in time and succesfully set-up

  • RPC pre-production will allow complete test of the system for end of August

  • Many tests on the full scale RPC prototypes -> good results

  • Mechanics on the way on. First prototype for installation end of July

  • Electronics well suited. Need FE – DAQ integration. More people are coming

  • Production for OPERA at General Technica tight but acceptable.

not yet

true

end of September

Naple

true