Conditioning in the pit
This presentation is the property of its rightful owner.
Sponsored Links
1 / 1

Conditioning in the PIT PowerPoint PPT Presentation


  • 42 Views
  • Uploaded on
  • Presentation posted in: General

Conditioning in the PIT. Preliminary planed: Condition to -2,3 kV (I<200 nA) and +2,85 kV (I<6nA): R2 in M4/5, R3 in M2-M5, R4 in M5 (only four top rows), R2-R4 in M1. And the rest – all chambers which have been tripped with beam. 17.01.11. Oleg. 1.

Download Presentation

Conditioning in the PIT

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Conditioning in the pit

Conditioning in the PIT

Preliminary planed:

Condition to -2,3 kV (I<200 nA) and +2,85 kV (I<6nA):

R2 in M4/5, R3 in M2-M5, R4 in M5 (only four top rows), R2-R4 in M1.

And the rest – all chambers which have been tripped with beam.

17.01.11

Oleg

1


  • Login