The TEAP and TOC 2010 Assessment Reports
Download
1 / 11

T E A P a n d T O C s - A s s e s s m e n t 2 0 1 0 - PowerPoint PPT Presentation


  • 218 Views
  • Uploaded on

The TEAP and TOC 2010 Assessment Reports Timelines and issues that will be dealt with TEAP and its TOCs Technology and Economic Assessment Panel CTOC: Chemicals TOC FTOC: Foams TOC HTOC: Halons TOC MTOC: Medical TOC MBTOC: Methyl bromide TOC

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'T E A P a n d T O C s - A s s e s s m e n t 2 0 1 0' - omer


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
Slide1 l.jpg

The TEAP and TOC 2010 Assessment Reports

Timelines and issues that will be dealt with

T E A P a n d T O C s - A s s e s s m e n t 2 0 1 0, M O P - 20, D o h a


Teap and its tocs l.jpg
TEAP and its TOCs

  • Technology and Economic Assessment Panel

    • CTOC: Chemicals TOC

    • FTOC: Foams TOC

    • HTOC: Halons TOC

    • MTOC: Medical TOC

    • MBTOC: Methyl bromide TOC

    • RTOC: Refrigeration, AC and Heat Pumps TOC

T E A P a n d T O C s - A s s e s s m e n t 2 0 1 0, M O P - 20, D o h a


2010 teap and toc assessment reports l.jpg
2010 TEAP and TOC Assessment Reports

  • Timeline of Work:

    (2008)-2009:

    • Definition of scope and content of the reports

    • Designation of chapter lead authors for specific chapters and sections, as well as the entire authorship

    • Initial determination of reports structure and layout (TOC meeting)

    • Identification of areas needing particular work - development of task-list

    • TOC meetings to discuss items and decide on first draft

    • First draft of reports (when dependent on specific TOC) and discussions

T E A P a n d T O C s - A s s e s s m e n t 2 0 1 0, M O P - 20, D o h a


2010 teap and toc assessment reports4 l.jpg
2010 TEAP and TOC Assessment Reports

  • Timeline of Work:

    2010:

    • Further compilation and update of necessary information

    • Report drafting (new drafts)

    • TOC meetings or CLA-TOC meetings to discuss drafts

    • Preparation of review drafts (and possible external review)

    • Final discussion of comments and review comments (TOC meetings)

    • Finalisation of TEAP report

    • Submission of reports by 31 December 2010

T E A P a n d T O C s - A s s e s s m e n t 2 0 1 0, M O P - 20, D o h a


Ctoc 2010 assessment report l.jpg
CTOC 2010 Assessment Report

  • Process Agents (as a follow up to XVII/6)

  • Laboratory and Analytical Uses

  • nPB; Overview of updates (in response to Decision XIII/7)

  • Feedstocks and emissions from feedstocks

  • Reconciling bottom-up CTC emissions versus emissions derived from atmospheric measurements

  • Use of solvents and non-medical aerosol propellant applications

  • Update on destruction technologies

T E A P a n d T O C s - A s s e s s m e n t 2 0 1 0, M O P - 20, D o h a


Ftoc 2010 assessment report l.jpg
FTOC 2010 Assessment Report

  • Report on transition to zero ODP options in Article 5 and non-Article 5 Parties

  • Review status of proven in-kind technologies (HCs, HFCs) to replace HCFCs in foam and comparison with not-in-kind options

  • Evaluation and validation of methodologies to estimate the impact on climate change of HCFC phase-out projects (LCCP, Functional Units, GWP)

  • Validation of emerging in-kind HCFC replacement technologies as potential alternatives tohigh GWP HFCs and hydrocarbons (HCs) including: methyl formate, HFC(HFO)-1234ze, other liquid HFCs (HFOs)

  • Evaluation of pilot projects to assess the emerging technologies

  • Update size of banks and emissions of different ODP GHG blowing agents

  • Progress in bank management efforts

T E A P a n d T O C s - A s s e s s m e n t 2 0 1 0, M O P - 20, D o h a


Htoc 2010 assessment report l.jpg
HTOC 2010 Assessment Report

  • Update of halon supply and demand particularly with respect to airlines and Article 5 Parties

  • Assessment of the environmental and fire protection implications of over/ or under supply of halons and functionality of banking mechanisms to supply halons to ongoing critical needs

T E A P a n d T O C s - A s s e s s m e n t 2 0 1 0, M O P - 20, D o h a


Mtoc 2010 assessment report l.jpg
MTOC 2010 Assessment Report

  • MDIs

    • Review of available technology

    • Global status of the MDI transition

    • Progress of transition in Article 5 Parties

    • Production of pharmaceutical-grade CFCs

    • Remaining challenges for phase-out of CFC MDIs

  • Sterilants

    • Review of available technology

    • Global status of the sterilant transition

    • Global use of HCFCs

    • Remaining issues for the phase-out of ODS in sterilisation

T E A P a n d T O C s - A s s e s s m e n t 2 0 1 0, M O P - 20, D o h a


Mbtoc 2010 assessment report l.jpg
MBTOC 2010 Assessment Report

  • A listing of alternatives successfully adopted in non A5 and A5 Parties for all uses, with particular emphasis on remaining critical uses

  • Technical, economic and regulatory constraints to the adoption of alternatives to MB for remaining uses (non A5 and A5)

  • The contribution of MB phase-out to ozone layer protection, human health, sustainable development and the impact of alternatives on climate change, particularly in A5 Parties

  • An update on the technical and economic feasibility of emission reduction, recovery, reuse and destruction of MB

  • An analysis of QPS uses

  • Case studies on adoption of alternatives

T E A P a n d T O C s - A s s e s s m e n t 2 0 1 0, M O P - 20, D o h a


Rtoc 2010 assessment report l.jpg
RTOC 2010 Assessment Report

  • Report on transition to zero ODP options in Article 5 and non-Article 5 Parties

  • Review status of replacement technologies (HCs, HFCs, CO2, others) for HCFCs in the refrigeration and AC sub-sectors, specifically commercial and large size refrigeration, unitary AC and chillers

  • Review status and developments in sub-sectors which have already transitioned to non ODS solutions

  • Evaluation and validation of methodologies to estimate the impact on climate change of HCFC phase-out projects (LCCP, Functional Units, GWP)

  • Update size of banks and emissions of different refrigerants in the different refrigeration and AC subsectors

T E A P a n d T O C s - A s s e s s m e n t 2 0 1 0, M O P - 20, D o h a


Teap 2010 assessment report l.jpg
TEAP 2010 Assessment Report

The TEAP 2010 Assessment report will consist of:

  • An executive summary of the executive summaries of all TOC assessment reports (and will contain all executive summaries of the TOC reports)

  • Specific assessment of new developments and issues important for the 2010 Synthesis with the SAP and EEAP Assessment Reports

T E A P a n d T O C s - A s s e s s m e n t 2 0 1 0, M O P - 20, D o h a


ad