1 / 2

HRVOC Monitoring Requirements

HRVOC Monitoring Requirements. Cooling Towers Must measure flow and continuous concentration in all cooling tower return streams Must file QA/QC plan with state for approval Approval - how long will it take? How consistent will reviews be? Will delay implementation of projects

oma
Download Presentation

HRVOC Monitoring Requirements

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. HRVOC Monitoring Requirements • Cooling Towers • Must measure flow and continuous concentration in all cooling tower return streams • Must file QA/QC plan with state for approval • Approval - how long will it take? How consistent will reviews be? • Will delay implementation of projects • El Paso stripper, sparger or gas transfer membranes will be required, not a lot of experience with this in our plants • El Paso stripper and operating conditions, equations defined in Appendix P • Total strippable VOC measurement opens doors to other techniques • Methane/ethane exclusion • Minimum detection limits of no more than 10 ppbw in water • Review math in Appendix P, assumes total transfer to gas phase of VOCs • Henry’s Law evaluation not required • Cycle time for analysis • Shorter if using total hydrocarbons or some other aggregate property analyzer • If using speciation anyway the ability to get measurement done in 15 minutes is easier. • Calibration • Local calibration direct into analyzer • Periodic testing of water/hydrocarbon mix Texas City ISA Section Meeting

  2. Monitoring Cooling Towers and Flares • Flares • Concentration and flow measurement required in header after last knockout, BTU measurement also required • Design and operating conditions for some flares will make this a very unique situation • Monitoring requirements list Performance Specification 9 (PS 9), a GC method for the calibration requirements • Too specific, should be able to use other analysis methods such as FTIR, mass spectrometers, and calorimeters • PS 9 performance requirements are too stringent, e.g., 120 deg. C sample lines and oven • Different test methods for organics and inorganics • Why not use a calibration gas method like we do with other analyzers rather than rely on lab tests? • Since we have to do compounds necessary for HRVOCs and BTU how far out do we analyze? Texas City ISA Section Meeting

More Related