1 / 7

Water

Water. Ecuador. 2. Team 11 . Josiah Dobson Brett Nicholson Travis Befus. Objective. To develop an elevated water storage and pumping system that can be implemented in rural communities worldwide

olive
Download Presentation

Water

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Water Ecuador 2 Team 11 Josiah Dobson Brett Nicholson Travis Befus

  2. Objective To develop an elevated water storage and pumping system that can be implemented in rural communities worldwide Focus on providing a reliable system for two communities in Ecuador through HCJB

  3. Design Norms Stewardship -Use only materials local to Ecuador -Efficient use of all resources Transparency -maintain open communication with our client, HCJB -Make sure the communities we are serving are aware of developments

  4. Locations Washintsa -15 family community -Currently has no water system -Requires a complete distribution system, tower and pump design Iniayua -25 family community -Current tower is on the verge of collapse due to lack of maintenance and poor material construction -Tower does not meet capacity requirements

  5. Design Tower -Tower will be built using steel or wood materials -Modeling will be conducted using StaadPro and RAM Steel -Must provide sufficient storage capacity and pressure to meet the demands -Must withstand the climate elements Pump -Solar powered pump must meet average daily flow conditions -Determine optimum number and size of solar panels based on user demand and weather conditions Distribution System -A complete distribution system will be design for Washintsa -Modeling will be conducted using EPANET

  6. Constraints Weight and Size Constraints -Materials not from village must fit in a small aircraft -Maximum material length is 6 feet -Cannot exceed 800 pounds per plane load -largest hard plastic tank that can fit is 145 gallons Simple Construction -Constructed without the use of electricity -Constructed with unskilled labor force Cost

  7. Travel to Ecuador Team plans to travels to Ecuador in January for 9 days Visit the two sites to meet with the end users and collect data -topographic -soil conditions -layout of the village -Analyze local materials

More Related