Target Considerations for Nufact and Superbeams

Target Considerations for Nufact and Superbeams. ISS Meeting RAL April 26, 2006. Main Study Parameter. Design for: 4 MW. Driving Target Issues. Meson Production Proton Beam Pulse Length Proton Beam Structure. Stephen Brook’s Analysis. Pions.

Download Presentation

Target Considerations for Nufact and Superbeams

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Target Considerations for Nufact and Superbeams ISS Meeting RAL April 26, 2006

  2. Main Study Parameter • Design for: • 4 MW

  3. Driving Target Issues • Meson Production • Proton Beam Pulse Length • Proton Beam Structure

  4. Stephen Brook’s Analysis Pions • Pions counted at rod surface • B-field ignored within rod (negligible effect) • Proton beam assumed parallel • Circular parabolic distribution, rod radius Protons 1cm Solid Tantalum 20cm

  5. Yield of p± and K± in MARS Finer sampling • No surprises in SPL region • Statistical errors small • 1 kaon  1.06 muons

  6. The Study 2 Capture Concept • Maximize Pion/Muon Production • Soft-pion Production • High Z materials • High Magnetic Field Solenoid

  7. The Study2 Target System • Consider Liquid Hg • Count all the pions and muons that cross the transverse plane at z=50m. • For this analysis we select all pions and muons with KE< 0.35 GeV.

  8. Optimize Soft-pion Production using Hg

  9. Meson KE < 350 MeV at 50m Mesons/Proton Mesons/Proton normalized to beam power

  10. Process mesons through Cooling Consider mesons within acceptance of ε┴ = 30π mm and εL = 150π mm after cooling 350 MeV Use meson count with KE < 350 MeV as a figure of merit.

  11. Post-cooling 30π Acceptance

  12. Carbon Target Parameters Search

  13. Carbon Target Optimization Set R=1.25cm; tilt angle = 50 mrad; Length=60cm; Z=-40cm

  14. Proton KE Scan with Carbon • Count mesons within acceptance of • ε┴ = 30π mm and • εL = 150π mm • after cooling

  15. Summary of Results • Compare Meson production for Hg at 24 GeV and 10 GeV • Compare Meson production for C at 24 GeV and 5 GeV • Compare Meson production for Hg at 10 GeV and C at 5 GeV 1.07 1.10 1.90 1.77 1.18 1.22

  16. Conclusion • Optimum Input Proton Beam Energy for Study2a configuration with Hg: • 8 to 20 GeV • Superbeam proton beams energies: • Mini-boone 8GeV • BNL AGS 28 GeV • Jpark 30 to 50 GeV • Numi 60 to 120 GeV • CNGS 400 GeV

  17. Driving Target Issues • Meson Production • Proton Beam Pulse Length • Proton Beam Structure

  18. Proton Beam Pulse Length Study 2a J. Gallardo, H. Kirk

  19. Conclusion • Optimum Proton Beam Pulse Length for Study2a configuration: • 1ns • Superbeam proton beams energies: • BNL AGS 28 GeV 10ns • Numi 4 μs • CNGS 2 x 5 μs

  20. Driving Target Issues • Meson Production • Proton Beam Pulse Length • Proton Beam Structure

  21. Proton Beam Intensity Protons per pulse required for4MW

  22. Shock Stress Analysis N. Simos

  23. SUMMARY of Performance Solid Targets

  24. 5 X 50 Proton Beam Structure • Johnstone, Meot, Rees • 10 GeV Proton Beam • 50 Hz • n = 5 sub-structure => 10 x 1012 protons (10TP) per micro-bunch • Accelerate 3 to 10 GeV with harmonic 36 structure and frequency of 13.079-13.417 MHz • Adiabatically compress to 2ns • Further compress to 1ns with f=80.5 MHz and f=201.25MHz

  25. Pulse Delivery to Target • ΔT = 13 μs => 52 μs bunch structure • Liquid Target • ΔT = 65 μs => 260 μs bunch structure • Solid Target

  26. Muon Bunch Pattern in Decay Rings • . > 100ns intervals 80 μ+ 127(130) 148(133) solid/liquid 80 μ+ 127(130) 2 of 5 interleaved 80 μˉ bunchtrains of 2nd ring 80 μ+ 80 μ+ 127(!30) 80 μ+ 127(130) 80 full and 127 (or 130) empty RF buckets