Replace Roof System Bldg 3600 Naval Air Station, Pensacola, FL

Replace Roof System Bldg 3600 Naval Air Station, Pensacola, FL . Pre Construction Meeting. W912DY-08-D-0020 TO 0012. Replace Roof System Bldg 3600 Naval Air Station, Pensacola, FL. Schedule.

ocean
Download Presentation

Replace Roof System Bldg 3600 Naval Air Station, Pensacola, FL

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Replace Roof System Bldg 3600 Naval Air Station, Pensacola, FL Pre Construction Meeting W912DY-08-D-0020 TO 0012

  2. Replace Roof System Bldg 3600 Naval Air Station, Pensacola, FL Schedule

  3. ID Task Name Duration Start Finish 1 Notice to Proceed 0 days Mon 5/2/11 Mon 5/2/11 2 Mobilization 10 days Tue 7/5/11 Mon 7/18/11 3 Area "A" Roofing 21 days Tue 7/19/11 Tue 8/16/11 4 Remove Roof Ballast - Area "A" 3 days Tue 7/19/11 Thu 7/21/11 5 Remove Existing EPDM Roof - Area "A" 3 days Fri 7/22/11 Tue 7/26/11 6 Install new Base Sheet & SBS Ply Sheet - Area 3 days Wed 7/27/11 Fri 7/29/11 7 Install SBS Cap Sheet - Area "A" 5 days Mon 8/1/11 Fri 8/5/11 8 Install Base Flashing - Area "A" 1 day Mon 8/8/11 Mon 8/8/11 9 Install Metal Counter Flashing - Area "A" 1 day Tue 8/9/11 Tue 8/9/11 10 Install Metal Edge/Cap - Area "A" 5 days Wed 8/10/11 Tue 8/16/11 11 Area "B" Roofing 21 days Wed 8/17/11 Wed 9/14/11 12 Remove Roof Ballast - Area "B“ 3 days Wed 8/17/11 Fri 8/19/11 13 Remove Existing EPDM Roof - Area "B“ 3 days Mon 8/22/11 Wed 8/24/11 14 Install new Base Sheet & SBS Ply Sheet - Area 3 days Thu 8/25/11 Mon 8/29/11 15 Install SBS Cap Sheet - Area "B" 5 days Tue 8/30/11 Mon 9/5/11 16 Install Base Flashing - Area "B" 1 day Tue 9/6/11 Tue 9/6/11 17 Install Metal Counter Flashing - Area "B“ 1 day Wed 9/7/11 Wed 9/7/11 18 Install Metal Edge/Cap - Area "B" 5 days Thu 9/8/11 Wed 9/14/11 19 Area "C" Roofing 19 days Thu 9/15/11 Tue 10/11/11 20 Remove Roof Ballast - Area "C" 3 days Thu 9/15/11 Mon 9/19/11 21 Remove Existing EPDM Roof - Area "C“ 3 days Tue 9/20/11 Thu 9/22/11 22 Install new Base Sheet & SBS Ply Sheet - Area 3 days Fri 9/23/11 Tue 9/27/11 23 Install SBS Cap Sheet - Area "C" 3 days Wed 9/28/11 Fri 9/30/11 24 Install Base Flashing - Area "C" 1 day Mon 10/3/11 Mon 10/3/11 25 Install Metal Counter Flashing - Area "C“ 1 day Tue 10/4/11 Tue 10/4/11 26 Install Metal Edge/Cap - Area "C“ 5 days Wed 10/5/11 Tue 10/11/11 27 Close Out Docs 30 days Wed 10/12/11 Tue 11/22/11 28 Demolization 2 days Wed 11/23/11 Thu 11/24/11

  4. Replace Roof System Bldg 3600 Naval Air Station, Pensacola, FL Critical Submittals

  5. Replace Roof System Bldg 3600 Naval Air Station, Pensacola, FL Critical Submittals All Submittals have been previously approved and available on Dr Checks

  6. Replace Roof System Bldg 3600 Naval Air Station, Pensacola, FL List of Client Action Items

  7. Replace Roof System Bldg 3600 Naval Air Station, Pensacola, FL List of Client Action Items 1 Move Trailer containing cardboard from loading dock area 2 3 4

  8. Replace Roof System Bldg 3600 Naval Air Station, Pensacola, FL Questions from the Client ?

  9. Replace Roof System Bldg 3600 Naval Air Station, Pensacola, FL Review of Additional Risk

  10. Replace Roof System Bldg 3600 Naval Air Station, Pensacola, FL All risks have been disclosed in our submitted and approved APP no additional risks have been identified previous to this meeting

  11. Replace Roof System Bldg 3600 Naval Air Station, Pensacola, FL Review of Value Added Items

  12. Replace Roof System Bldg 3600 Naval Air Station, Pensacola, FL No value added Items are associated with this project

  13. Replace Roof System Bldg 3600 Naval Air Station, Pensacola, FL Contract Management Plan

  14. Replace Roof System Bldg 3600 Naval Air Station, Pensacola, FL • The DKJV, Project Manager will take Digital photographs of the construction area prior to the start of construction.

  15. Replace Roof System Bldg 3600 Naval Air Station, Pensacola, FL • Project CQC System Manager, superintendent Bill Soltis will conduct periodic “Quality Construction and Management” (QCM) meetings. • All portions of the Work Plan and project activities will be reviewed at these meetings. Maintaining Quality will be the primary focus of these meetings.

  16. Replace Roof System Bldg 3600 Naval Air Station, Pensacola, FL • Weekly project coordination meetings will be conducted with the customer and documented by the on-site CQC System Manager /Superintendent. • Minutes of the meetings will be prepared by Bill Soltis, distributed to all attendees, and will become part of the project file. • Weekly subcontractors’ meetings are also held to review current progress and address issues of concern. • Minutes of the meetings will be prepared, distributed to all attendees, and will become part of the project file.

  17. Replace Roof System Bldg 3600 Naval Air Station, Pensacola, FL • As built drawings will be kept by DKJV, and updated on a regular basis by all the subcontractors. • Each update will be dated to reflect current status. Bill Soltis will review as built drawings to insure that drawings have been updated in a timely basis, that the updates are correct and are clear understandable. • As built drawings will be available for review by the Government.

  18. Replace Roof System Bldg 3600 Naval Air Station, Pensacola, FL Quality Control Checklist Review

  19. Replace Roof System Bldg 3600 Naval Air Station, Pensacola, FL DKJV has prepared and included in our approved QC plan as attachment C QC Preparatory Phase Inspection Checklist. This checklist will be used during the preparatory meetings for all definable features of work. These Checklist will be filed and will become part of the contract file.

  20. Replace Roof System Bldg 3600 Naval Air Station, Pensacola, FL DKJV has prepared and included in our approved QC plan as attachment D QC Initial Phase Inspection Checklist. The Initial Phase Checklist (Attachment D) is performed shortly after work begins and is documented with the Attachment D Report. The Initial phase procedures shall be repeated for each definable phase of work as defined in 2.6.2.5, and for each new on-site crew prior to work on-site, or anytime the established quality level of workmanship is not being met.

  21. Replace Roof System Bldg 3600 Naval Air Station, Pensacola, FL DKJV has prepared and included in our approved QC plan as attachment E QC Daily Report. The Follow Up Phase is incorporated as part of the daily quality inspection (Attachment E) to assure continued compliance with workmanship requirements established at the Preparatory and Initial Phase Inspections, and documented on the Quality Control Daily Report.

  22. Replace Roof System Bldg 3600 Naval Air Station, Pensacola, FL Performance Evaluation Process

  23. Replace Roof System Bldg 3600 Naval Air Station, Pensacola, FL • Quality control inspections will be conducted to insure the work is installed as contracted and as submitted. • Our CQC System Manager Bill Soltis will make these inspections. • A minimum of three Quality Inspections will be made during the work shift, the first at the commencement of daily activity, the last at the end of the work day to insure that materials and tools have been properly stored and that the work area has been cleaned. • Quality Control Inspection will include:

  24. Replace Roof System Bldg 3600 Naval Air Station, Pensacola, FL • Quality Control Inspection will include: • 1 A review of the contract requirement and submittal information. • 2 Confirmation that all equipment and material has been submitted and approved. • 3 Confirmation that all required testing procedures is in place. • 4 Comparison of actual field progress with scheduled field progress. • 5 An examination of materials, equipment, and samples to be sure they conform to • approved submittal and contract requirement. • 6 A check of the work for improper installation, damaged or defective materials. • 7 Verification of dimensional requirements. • 8 Verification that as-built information is being properly documented.