Gunnison Basin Implementation Plan Presentation to the Colorado Water Conservation Board July 16 , 2014. The GBIP in a Nutshell: Approach. Solid guidance from GBIP subcommittee Minor restructuring to address local issues and flow Targeted technical outreach

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about ' Gunnison Basin Implementation Plan Presentation to the Colorado Water Conservation Board' - oakley


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript

Gunnison Basin

Implementation Plan

Presentation to the

Colorado Water Conservation Board

July 16, 2014


The gbip in a nutshell approach
The GBIP in a Nutshell: Approach

  • Solid guidance from GBIP subcommittee

  • Minor restructuring to address local issues and flow

  • Targeted technical outreach

  • GBRT assistance with public outreach

  • Avoid duplication of previous efforts


The gbip in a nutshell content
The GBIP in a Nutshell: Content

  • Primary Goal: Protect Existing Uses

  • Focus on Agricultural Shortages

  • Agricultural Shortages = Agricultural Gap

  • Focus on Modeling

  • Tiered & Combined Project List




Introduction
Introduction

  • Overview of the Gunnison Basin

    • Layout and Land Ownership

    • Hydrology and Water Management

    • Water Rights Administration

    • Environmental Flow Management

    • Water Quality and Watershed Management

    • Water Related Recreation

    • Economic Impacts of Water Use

  • Overview of the Gunnison Basin Implementation Plan

    • Purpose

    • Outreach Process

    • Report Structure

  • Overview of Available Basin Information

    • Modeling Tools

    • Basin Studies


Section 1 basin goals
Section 1: Basin Goals

  • Introduction

  • Basin Goals

  • Statewide Principles




Section 2 basin needs
Section 2: Basin Needs

  • Introduction

  • Agricultural Needs

    • Summary of Process

    • Recent Updates (Including Drought Study Impacts)

    • Summary of Needs

  • Municipal and Industrial Needs

    • Summary of Process

    • Recent Updates (Including Drought Study Impacts)

    • Summary of Needs

  • Environmental and Recreational Needs

    • Summary of Process

    • Recent Updates (Including Drought Study Impacts)

    • Summary of Needs



Section 3 basin evaluations
Section 3: Basin Evaluations

  • Introduction

  • Gunnison Basin Water Resources Allocation Model

  • Case Studies

    • Water Availability Analysis (Historical Hydrology)

    • Water Availability Analysis (CRWAS Projected Climate Hydrology)

    • Upper Basin Supplemental Irrigation Decrees

    • Multipurpose Win-Win Projects

    • Instream Flow Analysis

  • Mapping Overlays





Section 4 basin projects
Section 4: Basin Projects

  • Introduction

  • Project Lists

    • Planned Projects

    • Environmental Protections and Monitoring

    • Completed and Ongoing Projects

  • Project Summary Template

  • Project Summaries (Planned Projects)


Section 4 projects to highlight
Section 4: Projects to Highlight

  • Tier 1: Implementation likely feasible by 2020; project does excellent job of meeting Basin Goals.

  • Tier 2: Implementation likely not feasible by 2020; project would excel at meeting Basin Goals. Project may also have important conditional water rights and/or completed planning efforts.

  • Tier 3: Implementation likely not feasible by 2020; project in preliminary stages of planning and/or may meet Basin Goals to lesser degree.


Section 4 planned project list
Section 4 – Planned Project List

  • Started withmost recent SWSI list – new & refined

  • Projects assessed for: water availability, feasibility, and competition for same water

  • Modeling analysis as requested

  • Large variability in project data

  • Significant effort in data collection

  • Proposed inventory projects

    • Inventory, assessment, and prioritization

    • Address infrastructure needs





Section 5 conclusions recommendations
Section 5: Conclusions & Recommendations

  • Introduction

  • Conclusions

    • Basin Goals

    • Basin Needs

    • Basin Evaluations

    • Basin Projects

    • Project Effectiveness in Meeting Goals and Measurable Outcomes

  • Recommendations (Implementation Strategies)

    • Project Acceptance

    • Project Feasibility




Gbip status
GBIP Status

  • On schedule and on budget

  • GBRT review of 2 full drafts (tracking changes)

  • Incorporating final comments

  • Final draft comment deadline this Friday (7/18/14)

  • GBIP Subcommittee Meeting: 7/29/14

  • Submittal to CWCB: 7/31/14

  • No current plans for further funding