An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Quick ChangeoverSingle Minute Exchange of Dies Lean Manufacturing Series

  2. Outline • Changeover and Changeover Time • Traditional Setup • SMED • SMED Process Steps • Ideas for Improvement

  3. Traditional Setup Practices Material movement occurs after the machine is turned off. • Completed products are transferred to next operation. • Raw material is moved after the machine is stopped. Detection of defects or missing equipment is noticed when the machine is running. • Setup tooling delivered after the changeover has begun. • Defective product identified after internal setup has begun. Defective tooling, fixtures, setup instruments are noticed after the machine is turned on. • The operator notices that equipment is missing after internal setup has begun.

  4. Setup reduction methodology • Many key ideas developed by Shigeo Shingo • Shingo called it SMED • Single minute exchange of dies • Means single digit, i.e. Less than 10 minutes • Example: 1000-ton press • Before: 4 hr • After: 3 min • Improvement: 98.7%, or a factor of 80

  5. One Step Fastening Bolt attachments requires 32 complete turns for each bolt or screw (1 for each thread) to fasten this bolt and die to a machine. This clamp attachment requires one step to attach the die to a machine.