Issues in the
This presentation is the property of its rightful owner.
Sponsored Links
1 / 9

Issues in the AIA/ASD Suite of ILS Standards PowerPoint PPT Presentation


  • 88 Views
  • Uploaded on
  • Presentation posted in: General

Issues in the AIA/ASD Suite of ILS Standards. Inputs to the KoM of the ILS Handbook. R . Somoza Airbus Military. Logistic Support Analysis activities. Order admini- stration. Provisioning data. Logs mat and data. LSA data. Operational data. Pro- visioning.

Download Presentation

Issues in the AIA/ASD Suite of ILS Standards

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Issues in the aia asd suite of ils standards

Issues in the

AIA/ASD Suite of ILS Standards

Inputs to the KoM of the ILS Handbook

R. SomozaAirbus Military


Overview of ils standards

Logistic

Support

Analysisactivities

Order

admini-

stration

Provisioningdata

Logs matand data

LSAdata

Operationaldata

Pro-visioning

Equipment identificationdesign data

Design of systems and support equipment

In service use

S2000M

Technical

Publi-cations

S3000L

S4000M

Designdata

S1000D

Overview of ILS standards

Operational and maintenance data feedback – S5000F

IP DataSubsets

IETM, other media


Main issues on ils suite of specifications 1 2

Global process unclear. “Ideal” ILS process is in practice impossible, but no room for parallel development (e.g., S3000L, S2000M and S1000D work) due to lack of synchronization mechanisms.

Feedback relationship and orchestration (S1000D, S2000M, S5000F) unclear.

Different business rules / criteria / formats (e.g., for applicability)

No common data model. No common glossary or data dictionary.

No real data integration – specifications are separate “silos”. No global / transversal view. Different product structures.

Parallel evolution of different specifications, without coordination / configuration (“mixability” of specification versions?)

Computational problems not considered (e.g, required parsing of applicability)

Implementation costs of the specifications, cost of evolution

Interfaces between specifications are bilateral – “explosion” of interfaces, circular relationships and coherence problem (e.g., S1003X+S1002X=S2003X?).

Main issues on ILS Suite of Specifications(1/2)


Main issues on ils suite of specifications 2 2

No common data exchange mechanisms.

Exchange not part of the suite of specifications.

Exchange of data of a SAME specification (e.g., between supplier & prime contractor) unclear, except for S2000M.

Formal relationship with OASIS – Are the A&D DEXes formally endorsed by AIA/ASD? How is the evolution of these DEXes controlled? By whom?

DEX implementation guidelines (e.g., for SOA) not established globally.

No specification/cross-specification Implementor forums

Civil/military convergence? (currently only used massively for S1000D)

Use of ILS in civilian programs

Need for specific annexes (e.g., domain-specific)?

Standard integrated data delivery format (e.g., for maintenance systems)?

Relationship with ATA beyond S1000D? (e.g., S4000M, Spec2000)

Main issues on ILS Suite of Specifications(2/2)


Gaps in the ils suite

Gaps in the ILS Suite

  • Configuration of ILS products

  • Operations

  • Use of 3D (Technical publications, training, maintenance…)

  • Orchestration of services


Issues in the aia asd suite of ils standards

BASIC

PROCESSES

PRIMARY PROCESSES

SECONDARY

PROCESSES

PRODUCT & SERVICES

Integrated Logistic Support

S E R V I C E S

Group 1 Logistic Support Analysis

  • Maintenability

  • Reliability

  • Testability

INDUSTRY

  • Influence Design

Product

Design

  • Analyze Results

  • Maint. Program

  • LCC

Support to

Product

Design

Group 2 Support Equipments

& Simulators

Design the

Product

Support

Equipment

  • AGE

  • ATE

  • GSE

  • Design AGE

  • Design

    Training Devices

  • CBT

  • FFS

  • MST

OPERATOR

  • Operations Manual Checklist

  • MMEL

  • Develop Operational Documentation

Group 3

Support, Maintenance

& Operations

Support

Operation

  • Design Crew Courses

  • Courses

  • Manuals

  • Design Maintenance Courses

  • Courses

  • Manuals

  • Design Maintenance Support

  • FSR

  • SB (Upgrades)

  • MRO

Support

Maintenance

  • Develop Maintenance

    Documentation

  • AMM

  • CMM

  • WDM

Customer Support

  • Prepare

    Material Support

  • IPC

  • Develop Material

    Documentation

  • IPL

  • Repair Services

Program Office

  • Develop Services

    Level Agreements

  • Deliver

    the Contracted Service

Group 4 Customer Solutions

Mission &

Operation of Services

  • Develop Documentation

  • Develop Processes


Issues in the aia asd suite of ils standards

SERVICES SCOPE OF ACTIVITIES

  • “Partnering”

  • Total services delivery

  • Operation of assets

  • PBL

Customer Related

  • “Outsourcing”

  • Customer Solutions

  • Services Centers

  • Repair Centers

  • Logistic Services

  • PBH

Mission & Operation of Services

Customer Services

  • “…abilities”

  • RMT

  • LSA

  • LORA

  • LCC

Product Related

Product Support

After Sales

  • “Classic Disciplines”

  • Technical Assistance

  • Material Support

  • Training

  • Tech. Documentation


Asd aia ils spec s organisation

ASD/AIA ILS Spec’s Organisation

Data Model and Exchange Working Group

ASD - CPSC

Customer & Product Support Committee

AIA

Product Support Committee

CPSC Specifications Group

ILS Spec Council

S2000MSteering Committee

S3000LSteering Committee

S4000MSteering Committee

S5000FSteering Committee

NB S1000D has separate organisation


Ils suite production plan

ILS Suite Production plan

ASD – STE100

Iss 5.0

Iss 6.0

Iss 4.0

S1000D

Iss 4.0

Iss 4.1

S1002X

S1003X Iss 0.1

S1003X Iss 1.0

S1003X Iss 1.1

S2000M

Iss 4.0

Iss 5.0

S2000M PLCS

S3002X

Iss 6.0

S3000L

Iss 1.1

Iss 1.0

Draft 0.1

S4000M

Draft 0.1

Iss 1.0

S5000F

Iss1.0

Draft 0.1

SX000I

Iss1.0

2005

2006

2007

2008

2009

2010

2011

2012

2013


  • Login