Pacific partnership 2012
This presentation is the property of its rightful owner.
Sponsored Links
1 / 39

PACIFIC PARTNERSHIP 2012 PowerPoint PPT Presentation


  • 75 Views
  • Uploaded on
  • Presentation posted in: General

PACIFIC PARTNERSHIP 2012. 18 JAN 12 OPT Brief. This brief is classified: UNCLASSIFIED. Roll Call. CDS-7 State Dept – Mr. Weinz USNS MERCY AUS HQ JOC HQ JFNZ JSDF FLC-Yokosuka C7F. C3F CTF 76 351 st Civil Affairs Command DLA Troop Support - Pacific ETG 30 th NCR

Download Presentation

PACIFIC PARTNERSHIP 2012

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Pacific partnership 2012

PACIFIC PARTNERSHIP 2012

18 JAN 12

OPT Brief

This brief is classified:

UNCLASSIFIED


Roll call

Roll Call

CDS-7

State Dept – Mr. Weinz

USNS MERCY

AUS HQ JOC

HQ JFNZ

JSDF

FLC-Yokosuka

C7F

  • C3F

  • CTF 76

  • 351st Civil Affairs Command

  • DLA Troop Support - Pacific

  • ETG

  • 30th NCR

  • HSC-21 DET 2

  • MCAST

Blue: Normal participants not expected to attend VTC due to scheduling conflict.


Pp 12 weekly planning rhythm

PP 12 Weekly Planning Rhythm

1100W read ahead slides posted to APAN

CPF N3

Semi-Monthly Update

1200W MED WG

Sun

Mon

Tues

Wed

Thurs

Fri

Sat

1300-1500W OPT VTC

1430W Comm Integration WG

1000W COMMS WG

1000W CA WG

1300W LOG WG

1200W ENG WG

1300W FP WG Every other week

Effective 09 JAN


Planning timeline

Planning Timeline

PLANORD

EXORD

Mid Planning Conference

Initial Planning Conference

CPF RFF

FSLO Letter

MOU Letters Signed

PN Invitation letters

Final

Initial

Requirements

Systems

Assessment plan

Advanced Echelon

PDSS

Deployment


Adf planning status

ADF Planning Status

General Planning

CJOPS Decision Brief for PP12 signed.

Command

Nomination of O-5 for position of COMASC submitted.

Call for nominations for ASNCE staff sent via signal.

Engineering

Two (2) ADF engineers participated in Indonesia PDSS. Still awaiting Post Activity Report.

Authorization to lead as FIE for Indonesia mission still to come from IPDIV.

Medical

Awaiting nominations for ADF Health PP12 positions from Services.

No Change


Adf participation

ADF Participation

Australia

Command Element

Engineering Section

Medical Personnel contribution of 15 – 20 pers in each contingent

Contingent 1 embark USNS MERCY in Guam and change out in Subic Bay Philippines

Contingent 2: embark USNS MERCY in Subic Bay Philippines and disembark at the conclusion of mission in Cambodia

Health manning TBC in late November

HQJOC Health PP12 POC:

CMDR Kenneth Walters (SO1 Reg / Dom & Joint Ex Hlth Plans) [email protected]

No Change


Pp12 rfi tracker

PP12 RFI Tracker

No Change


Jsdf planning status

JSDF Planning Status

  • CONOPS of Japan

    - Developing the CONOPS of Japan

    Country selection

    - Philippine

    - Vietnam

    Activities

    - Medical supports

    - Community service projects

    Introduction of culture etc.

    - Studying other activities

    - Decision after completion of PDSS

    Vehicles

    - JMSDF Ship (TBD×1)

    - JASDF Aircraft(C-130orKC-767×1)

    Medical team

    - Approximately 20~30

No Change


Jsdf planning status1

JSDF Planning Status

  • PDSS

  • -Request re-survey Philippines with U.S. survey team in FEB or MAR

  • 2012

  • Humanitarian community in Japan

  • - Not yet access

  • POC

  • PRI: LCDR Haga : [email protected] DSN:224-7714 or 7723

  • SEC: LCDR Yamaguchi : [email protected]

No Change


Jsdf planning status2

JSDF Planning Status

No Change


Nzdf planning status

NZDF Planning Status

  • Decision by COMD Joint Forces New Zealand is to deploy a small multi-disciplinary health team for the duration of the deployment to Vietnam 10 – 24 Jul 12.

  • Contingent: Plan to embark USNS MERCY in Subic Bay Philippines / disembark at the conclusion of mission in Vietnam.

  • MAJ BROOKS – will attend Main Planning Conference (30 - 31 Jan in San Diego)

  • as HQ JFNZ Rep. Now registered into APAN, awaiting membership to PP12 accounts.

  • Medical Personnel contribution: Manning TBC in early December (8 – 12 pers)

  • New HQJFNZ Health PP12 POC: MAJ Andrew BROOKS

  • DDI: +64 4 529 6124

  • [email protected]

No Change


Cpf fops update

CPF FOPS Update

  • Manning Update

  • FFC change in sourcing priorities

    • Augmentation package is now out for Joint Sourcing w/ a suspense of 23 Jan

    • Commitment received for med personnel

    • 32 non-med personnel still outstanding

  • CPF PLANORD released


Medical update

Medical Update

  • Medical WG Telcon held Tuesday, 17 January 2012, 1200 hrs

  • Identified Medical Planner to assist with Medical CONOPS development

  • Finalizing details for Medical Assessment visits to the Philippines and Cambodia


Engineering update

Engineering Update

Site Survey Projects RecommendedSMEE Request

Philippines3 schools & 1 medical clinicSeawall-Dr. Lin

Cambodia3 health centersBldg; P&E; CCAD

Indonesia3 health centers & 1 schoolSeismic; Disaster

Vietnam2 health centersDisaster; Safety

Australian Defence Force approval is approximately 90% complete.

-ADF determination of FIE will follow site survey report

Philippine Project Package preparation (ACB1 lead- BUC Sarmiento)

Cambodia Project Package preparation (NMCB40 lead)

Indonesia Project Package preparation (ADF lead/NMCB40 Alt)

Vietnam Project Package preparation (NMCB40 lead)

On-track

Off-Track/Recoverable

Off-Track not recoverable

Completed


Engineering update1

Engineering Update

NALO Flight request submissions.

- Confirm ability to land NALO C-130 at Talaud Airport, Indonesia.

Inability will require using a combination of Manado Airport and

commercial surface shipping.

- Confirm ability to land NALO C-130 at Calbayog City, Samar

Philippines.

- Vietnam mission will require NALO C-130 to land at Hanoi IOT

clear customs, movement of equipment and PAX to Nghe An

Province via contracted trucks and passenger bus.

Identify all customs and entry requirements for Indonesa, Philippines,

And Vietnam.

- Visa requirements for PAX (30+ days)

- Required documents for tools and equipment (customs process

and US Embassy customs POC

On-track

Off-Track/Recoverable

Off-Track not recoverable

Completed


Logistics update

Logistics Update

  • Logistics WG held 17 Jan 12

  • Funding

    • APRI

      • MTF MERCY received $600K of required $1.9M

  • Pharmaceuticals and Consumables

    • Working with DLA to place initial orders

  • Donation Material

  • Next Logistics WG meeting scheduled for 24 JAN 12


Pacific partnership 2012

PP12Supply and Logistics StatusFUNDING (17JAN12)

17

Completed

On-track

Off-Track/Recoverable

Off-Track not recoverable


Pacific partnership 2012

PP12 Supply and Logistics StatusPHARMACEUTICALS and CONSUMABLES (17JAN12)

18

On-track

Off-Track/Recoverable

Off-Track not recoverable

Completed


Pacific partnership 2012

PP12 Supply and Logistics StatusDONATION MATERIAL (17JAN12)

19

On-track

Off-Track/Recoverable

Off-Track not recoverable

Completed


Pacific partnership 2012

PP12 Civil Affairs WG

20

Completed

On-track

Off-Track/Recoverable

Off-Track not recoverable


Pacific partnership 2012

PP12CIS Information Systems Status(18JAN12)

21

On-track

Off-Track/Recoverable

Off-Track not recoverable

Completed


Pacific partnership 2012

PP12CIS Information Systems Status(18JAN12)

22

On-track

Off-Track/Recoverable

Off-Track not recoverable

Completed


Pacific partnership 2012

PP12CIS Information Systems Status(18JAN12)

23

No Change

On-track

Off-Track/Recoverable

Off-Track not recoverable

Completed


Pacific partnership 2012

PP12CIS Information Systems Status (18JAN12)

24

On-track

Off-Track/Recoverable

Off-Track not recoverable

Completed


Pacific partnership 2012

PP12CIS Information Systems Status(18JAN12)

25

On-track

Off-Track/Recoverable

Off-Track not recoverable

Completed


Force protection update

Force Protection Update

  • MFP sourcing drop dead date and branch plan

  • TA possibilities (hotels, routes, etc)

  • HN/In country coordination update

  • Pre-Deployment travel Requirements

    • Updated ISOPREPs

    • APACS

    • iATP

    • AOR location specific brief

    • Level I ATFP

    • SERE 100 B


Public affairs update

Public Affairs Update

  • Admin

    • Mission PAO to DC 15-18 JAN for CHINFO/OSD/DOS meetings/coordination for mission roll-out

  • Media Coordination

    • CAPT Breslau, LCDR Lohmeyer will meet with Warner Bros. and NAVINFO WEST in LA 25 JAN


Public affairs update1

Public Affairs Update

On-track

Off-Track/Recoverable

Off-Track not recoverable

Completed


Public affairs update2

Public Affairs Update

On-track

Off-Track/Recoverable

Off-Track not recoverable

Completed


Pp12 communication integration

PP12 Communication Integration

Finalizing products to support detailed communication planning and assessment for each location (due 30 JAN)

Coordinating communication assessment support for PP12 (MAY – SEP 12)

Include “baseline” and post-mission support

Next CIWG meeting scheduled for: 19 JAN 12

AMEMB Cambodia, Vietnam Telecons being coordinated


Pacific partnership 2012

PP12 Communication Integration

31

Completed

On-track

Off-Track/Recoverable

Off-Track not recoverable


Pacific partnership 2012

PP12 Communication Integration

32

Completed

On-track

Off-Track/Recoverable

Off-Track not recoverable


Pacific partnership 2012

Planning Timeline

INDICATES UPDATE

UPDATED: 18JAN12


Mission commander priorities

Mission Commander Priorities

Country CONOPS Development

23-Jan-12COUNTRY CONOPS (DRAFT) TO CDRE

30-Jan-12MPC (PRESENT DRAFT CONOPS)

C2/Task Organization Proposal (next slide)

CMCC / ENG / MED / EST / Shore FP – requires additional C2 slides to show organization and relationships

Issues:

Dedicated medical planner

Prioritized list of MEDCAPs to aid in SOM development

Veterinarian – tasked w/ COBRA GOLD & day job; adversely affects contribution to CONOPS

Need refined SMEE list for each country

EAP input

Determining Medical contingent for ADVON / Mission

LT Owens – incorrect specialty code, may be ineligible for ADVON

CDR Currie – unable to participate in mission/deploy

LTJG Ward – only med planner


Pacific partnership 2012

Proposal

  • NOTE: CMCC, ENG, MED, EST, Shore FP – requires additional C2 slides to show organization and relationships


Mission commander priorities continued

MPC

Official agenda released in announcement message (CDS7 062325ZJAN12)

29JAN12 – Civilian Participant Planning and Discussion (USNS MERCY)

30-31JAN12 – MPC (Admiral Kidd Conference Center)

Mission Commander Priorities (continued)


Mission commander priorities continued1

Mission Commander Priorities (continued)

MPC - POA&M (continued)


Mission commander priorities continued2

Mission Commander Priorities (continued)

CMCC TTX (01FEB12)

Initial objectives:

Organization review

Job description assignment

Workspace familiarization

Communications familiarization

CMCC problem solving (scenario – walk-thru/talk-thru)

Participant List TBD

SLV preparations

Issues:

CPF participant requested

Vietnam visas

Agenda / KLE

Miscellaneous

Manning / Billet gaps

Proposed Mission Planning Rhythm in development

CMCC Watchfloor products in development:

SORM / SOPs

Watchbills

PPRs


Closing questions comments

Closing Questions/Comments

CPF Staff

State Dept – Mr. Weinz

AUS HQ JOC

HQ JFNZ

JSDF

FLC-Yokosuka

C7F

C3F

CTF 76

  • 351st Civil Affairs Command

  • DLA Troop Support - Pacific

  • 30th NCR

  • ETG

  • HSC-21 DET 2

  • MCAST

  • USNS MERCY

  • CDS-7


  • Login