Team pcg
Download
1 / 9

Team PCG - PowerPoint PPT Presentation


  • 135 Views
  • Uploaded on

Team PCG. Primary Faculty Advisor: Dr. Nuxoll Secondary Faculty Advisor: Dr. Crenshaw Industry Advisor: Andy McConnell Client: Dr. Cantrell. Ben Co (Fall Team Lead), Wendelin Mueller, Garrett Gustafson, and Julia Weimar-East On Project LightBox. Team.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about ' Team PCG' - nubia


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
Team pcg

Team PCG

Primary Faculty Advisor: Dr. Nuxoll

Secondary Faculty Advisor: Dr. Crenshaw

Industry Advisor: Andy McConnell

Client: Dr. Cantrell

Ben Co (Fall Team Lead), Wendelin Mueller, Garrett Gustafson, and Julia Weimar-East

On

Project LightBox


Team

  • Ben (Fall Leader) – CS & Biology Major

  • Wendelin – CS & Math Major

  • Julia – EE Major, CS Minor

  • Garrett – EE Major


Background
Background

  • Dr. Cantrell’s research in water quality.

  • Simplifying the equation: Testing water with membrane’s and a digital camera.

  • The Problem: White balance and the HSV color space.


Block diagram

DATA LINK

Block Diagram

DATA PROCESSOR

INTERFACE

BASE UNIT


Design challenges
Design Challenges

  • Accuracy

  • Light Diffusion

  • LED Color Mixing


Important decisions
Important Decisions

  • USB instead of Serial

  • Microcontroller

  • LEDs as light source

  • Windows 7 official OS


Risks
Risks

  • Time Management

  • Heat Production


Milestones overview
Milestones Overview

  • Functional Specification Version 0.95 - 28 Sep 2012

  • Decide on project technologies -12 Oct 2012

  • Final enclosure specs delivered to machine shop - 30 Nov 2012

  • Software and GUI are code complete - 8 Jan 2013

  • Complete Testing/Color Mixing of LEDs - 25 Jan 2013

  • Complete physical circuit construction -1 Feb 2013

  • Complete Final Version of Program - 22 Mar 2013

  • Final Report Version 0.95 - 29 Mar 2013


Conclusion
Conclusion

  • The PCG LightBox will aid Dr. Cantrell in research on white-balancing digital images.

  • Design Challenges

  • We Will Prevail!


ad