Handicap
Download
1 / 2

Handicap - PowerPoint PPT Presentation


  • 95 Views
  • Uploaded on

Intra Asia KPI Y2011. Handicap. Service: Unstable schedule of PAS & CN1 svc Skip 3 vessels of PAS on Feb 11 Omit 3 vessels of CN1 in 2 nd semester Cancel voyage of PAS svc 4 times Always delay of PAS & CN1 svc due to port congestion and defense Fog at PRC accident of Leo Perdana

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about ' Handicap' - nora


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
Handicap

Intra Asia KPI Y2011

Handicap

  • Service:

    • Unstable schedule of PAS & CN1 svc

      • Skip 3 vessels of PAS on Feb 11

      • Omit 3 vessels of CN1 in 2nd semester

      • Cancel voyage of PAS svc 4 times

      • Always delay of PAS & CN1 svc due to port congestion and defense Fog at PRC accident of Leo Perdana

    • Limited space on CN1/TPI/JTI svc

    • Different rate between PAS&CN1svc for china destination

    • Long Idle shipments to HCM/HPH/XGG

    • Heavy cargo problem impact to stacking weight problem and vessel stability

  • Business

    • Competitors’ action such as MCC/STX/TSL/APL & MOL to cut rate to VIP a/c for MNL/JPN/PRC (SHA/TAO/LYG) impact to lost VIP such as ATL/ASAHI/CAMCO OMYA/SURABAYA HONGKONG/ETC

    • Opening direct svc to JPN main port on JPI (KMTC/HJN/CMA) & JTI (WHL&IAL)

    • Few Cargo nomination to TWN/JPN/KRA due to rate higher



ad