1 / 5

M1 installation Status and Plans

M1 installation Status and Plans. Burkhard Schmidt Muon Meeting 16.03.2009. Progress week 11 (March 9). Present: AC, BS, FD, GP, SC, FR, MT, NB, SaG , StG , ThS , Di, Cl , FM, OM Progress: Dismounting top of access structure C-side: CF, PV (EA-team)

Download Presentation

M1 installation Status and Plans

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. M1 installation Status and Plans Burkhard Schmidt Muon Meeting 16.03.2009

  2. Progress week 11 (March 9) • Present: AC, BS, FD, GP, SC, FR, MT, NB, SaG, StG, ThS, Di, Cl, FM, OM • Progress: • Dismounting top of access structure C-side: CF, PV (EA-team) • Alignment bar preparation and installation:SaG, ThS, BS • Cabling Inner part: Advancing well on A-back. MT, StG • Installation R3/R4 chambers: The urgently to be mounted chambers on the top of A-front are in place. MT, BS • Installation GEM chambers C-back: Difficult, but progress has been made and the remaining problems are addressed properly. But we are not yet “out of the woods” and have unfortunately limited access this week. Di, Cl, FM, AC • Gas tests and Electronic tests: We are catching up. Overall the progress is good (see Fernando’s table for details). AC, FR

  3. Plans week 12 (March 16) • Present: AC, BS, FD, FR, MT, SaG, StG, ThS, Di, Cl, MAr, AZ, MAn, OM • Plans: • Alignment bar installation and survey:SaG, ThS, JCG, CF • Dismounting top of access structure A-side: CF, PV (EA-team) • Cabling Inner part: Complete A-back. MT, StG • Installation R4 chambers: Mount 1-2 chambers on top of A-back, (A-column) from calorimeter passarelle. MT, MAr • Installation GEM chambers: Continue with C-front today, then move to A-back from Tuesday afternoon until Thursday. Modify top balconies for GEM fixation. Di, Cl • Gas tests and Electronic tests: Continue to catch up. Start to fix problems discovered during the electronics test. AC, FR, MAn • Open C-side and install two nacelles between M3/4 and M4/5

  4. Preparatory work for week 12 (March 16) • We are late with cable arrangement for the inner part, mainly C-back. • (Access problem)

  5. Planning M1 No Access C-side (RICH2-HPD work) No Access A-side (RICH2-HPD work) No Access A-side (SPD/PS work) • 80 chambers mounted - 65were planned, we are still ahead . . . • We are limited in our activities this week due to alignment work and activities on RICH 2