DtiCorp.com Sample Roofing Contract

Download Presentation

Sample Roofing Contract

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Sample roofing contract

Roofing Contract

Specifications:

Supply tools and equipment necessary to complete work.

Supply nails required to complete all work.

Keep job site and materials in an orderly fashion.

Hoist all materials to roof levels.

Color and type of shingle to be:_________________________________________________

Quality of shingle to be:_______________________________ year guaranteed by manufacturer.

SupplyInstallInspected

__________________Ice and water shield.

__________________Metal Drip edge.

__________________Metal drib edge on gables.

__________________Shingles.

__________________50lb. Felt under valleys.

__________________Metal valleys.

__________________15lb. Perforated felt.

__________________All flashing.

__________________Roof vents.

__________________Skylights.

__________________Caulk and seal where required.

Extra Charges if any

$______________.____ for _____________________________________

$______________.____ for _____________________________________

$______________.____ for _____________________________________

Sub total: $____________________._____


Sample roofing contract

G.S.T.: $____________________._____

P.S.T: $____________________._____

TOTAL: $____________________._____

Obligations of owner to contractor:

Site preparation___________________________________________

Other___________________________________________________

Lead time required ________________________________________

Terms of payment:

Hold back of 10% for 30 days upon completion ($___________.____)

____________________________________________________________________________________________________________________________

____________________________________________________________________________________________________________________________

____________________________________________________________________________________________________________________________

____________________________________________________________________________________________________________________________

Contractors on site time to be:_______________________________________________

This is a DtiCorp.com document


  • Login