PACIFIC PARTNERSHIP 2012. 26 OCT 11 OPT Brief. This brief is classified: UNCLASSIFIED. Roll Call. CDS-7 State Dept – Mr. Weinz PACOM USARPAC USNS MERCY AUS HQ JOC HQ JFNZ JSDF FLC-Yokosuka. C7F C3F CTF 76 351 st Civil Affairs Command DLA Troop Support - Pacific 30 th NCR

Download Presentation

PACIFIC PARTNERSHIP 2012

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Pacific partnership 2012

PACIFIC PARTNERSHIP 2012

26 OCT 11

OPT Brief

This brief is classified:

UNCLASSIFIED


Roll call

Roll Call

CDS-7

State Dept – Mr. Weinz

PACOM

USARPAC

USNS MERCY

AUS HQ JOC

HQ JFNZ

JSDF

FLC-Yokosuka

  • C7F

  • C3F

  • CTF 76

  • 351st Civil Affairs Command

  • DLA Troop Support - Pacific

  • 30thNCR

  • HSC-23

  • MCAST


Pp 12 weekly planning rhythm

PP 12 Weekly Planning Rhythm

1000W read ahead slides posted to APAN

CPF N3

Semi-Monthly Update

1200W MED WG

Sun

Mon

Tues

Wed

Thurs

Fri

Sat

1300-1500W OPT VTC

0900W CA WG

1000W Comm Integration WG

1000W COMMS WG

CPF N33 Update

1300W LOG WG

1200W ENG WG

1300W FP WG Every other week

No Change


Planning timeline

Planning Timeline

PLANORD

EXORD

Mid Planning Conference

Initial Planning Conference

CPF RFF

FSLO Letter

MOU Letters Signed

PN Invitation letters

Final

Initial

Requirements

Systems

Assessment plan

Advanced Echelon

PDSS

Deployment


Adf planning status

ADF Planning Status

General Planning

CJOPS Decision Brief for PP12 signed

Command

Engineering

Medical

ADF Health manning to PP12 planning under way

No Change


Adf participation

ADF Participation

Australia

Command Element

Engineering Section

Medical Personnel contribution of 15 – 20 pers in each contingent

Contingent 1 embark USNS MERCY in Guam and change out in Subic Bay Philippines

Contingent 2: embark USNS MERCY in Subic Bay Philippines and disembark at the conclusion of mission in Cambodia

Health manning TBC in late November

HQJOC Health PP12 POC:

CMDR Kenneth Walters (SO1 Reg / Dom & Joint Ex Hlth Plans) [email protected]

MAJ Dominic Wade (SO2 Joint Ex Hlth Plans) [email protected] (until 2 Dec 11)


Pp12 rfi tracker

PP12 RFI Tracker


Jsdf planning status

JSDF Planning Status

  • CONOPS of Japan

    - Developing the CONOPS of Japan

    Country selection

    - Philippine

    - Vietnam

    Activities

    - Medical supports

    - Community service projects

    Introduction of culture etc.

    - Studying other activities

    - Decision after completion of PDSS

    Vehicles

    - JMSDF Ship (TBD×1)

    - JASDF Aircraft(C-130orKC-767×1)

    Medical team

    - Approximately 20~30

No Change


Jsdf planning status1

JSDF Planning Status

  • PDSS

  • - 5 persons / each country

  • Philippine and Vietnam

  • Planners

  • - MED, Ship visit, and others

  • Humanitarian community in Japan

  • - Not yet access

  • POC

  • LCDR Haga [email protected] DSN:224-7714 or 7723

No Change


Jsdf planning status2

JSDF Planning Status

No Change


Nzdf planning status

NZDF Planning Status

  • Decision brief has been prepared for COMD Joint Forces New Zealand based on FST deployment to Vietnam 10 – 24 Jul 12.

No Change


Force sourcing update

Force Sourcing Update

  • 71 Unsourced Billets

  • Updated breakdown will be provided next week.

  • USAF sourcing 16 billets.

  • Mass Comms Specialist LAD 23APR.

No Change


Medical update

Medical Update

  • Medical WG Telcon held on 25 Oct 11

  • Next one scheduled for Wed, 3 Nov 11, 1200 HST

  • All medical team members for PDSS Blue and Gold teams identified


Engineering update

Engineering Update

Engineering Working Group: Mondays 1500PST

  • PDSS teams have been assembled,

    • 5 PAX total per country

  • CONOPS being developed to determine FIE/SIE feasibility.

  • Possible engagement in Exercise Pacific Angel, VNM phase.

    RFI’s

  • Can US provide transportation support for an AUS FIE?

  • What is the Commanders guidance for logistics support ashore?

  • What ship to shore capability exists to support engineer LOO?

  • How will PN, HN life support requirements be met?

  • Who is responsible for non-US PDSS funding?

  • What is the C4I/Comm plan for VNM phase?

  • What C4I support can be provided for AUS contingent?

  • From HN, what are priority SMEE topics for engineers?

No Change


Logistics update

Logistics Update

  • PDSS:

    • PDSS Logistic team set for departure

  • Husbanding Requirements – ongoing discussions with SUPPO MERCY, FLC Yokosuka and FLC Singapore

    • Potential long-lead time requirements

    • Ports under Contracted support vs non-contracted


Civil affairs working group

Civil Affairs Working Group

WG time changed to 0900 Hawaii standard time.

Location changed to Main VTC room

No Change


Pacific partnership 2012

PP12CIS Information Systems Status(26OCT11)

17

On-track

Off-Track/Recoverable

Off-Track not recoverable

Completed


Pacific partnership 2012

PP12CIS Information Systems Status(26OCT11)

18

On-track

Off-Track/Recoverable

Off-Track not recoverable

Completed


Pacific partnership 2012

PP12CIS Information Systems Status(26OCT11)

19

On-track

Off-Track/Recoverable

Off-Track not recoverable

Completed


Pacific partnership 2012

PP12CIS Information Systems Status(26OCT11)

20

On-track

Off-Track/Recoverable

Off-Track not recoverable

Completed


Pacific partnership 2012

PP12CIS Information Systems Status(26OCT11)

21

On-track

Off-Track/Recoverable

Off-Track not recoverable

Completed


Force protection update

Force Protection Update

  • FPWG held Tuesday, 25 Oct. Next FPWG, 8 Nov.

  • PDSS Pre-Travel Requirements

    • Updated ISOPREPs

    • APACS

    • iATP

    • AOR location specific brief

    • Level I ATFP

    • SERE 100 B

  • NCIS/Security Requirements: Informal N2 RFI


Public affairs update

Public Affairs Update

  • Request PAO workspace in Bldg 55

  • ADSW on track for 1 DEC start

    • Integrate with CPF staff 7-23 NOV

  • Media Coordination

    • Discovery Channel embark

    • Thai Channel 5 embark

    • Social media embeds

  • Drafting Mission PAG

  • Coordinate DVIDS training for PA team

    • Equipment request

No Change


Pp12 communication integration

PP12 Communication Integration

Initial Stakeholder analysis complete

Working draft communication “plan” to include assessment

Communication Framework:

Pacific Partnership (2012) brings enhanced capability, opportunity for subject matter expert exchange and a venue for broadened regional relationship building at HN invitation

The story of Pacific Partnership (2012):

Will have shared ownership (providers, recipients, enablers) and be told from these individual perspectives

Will be told by the HN, PNs and NGOs

Will be focused on key, distinctive audiences vice single audience saturation and will leverage emerging media

Will be synchronized across time and space to ensure consistency (or approach and message) and stakeholder engagement to achieve desired goals

Will be echoed by other activities, operations and engagements (PVST, SMEE)

Will be captured, assessed and archived

No Change


Mission commander current priorities

Mission Commander Current Priorities

PDSS Preparations

Confirm / Finalize Participants

Status of: VISAs, FP requirements, medical requirements, passports, travel arrangements

Current Concerns?

PDSS Planning

In country transit/Site visit schedule/Agenda for OIC and AOIC in Manila

Identify Personnel Augments

PAO, PA team

Protocol Officer (CDS 7 Staff Action)

CIV-MIL officer (CDS 7 Staff Action)

Mission Training

Identify Mission Rehearsal Dates (March?)

PA/Integrated Communications Training

Budget

Confirm funds available

Execution plan?

CMOC

Mission Statement

Structure/Deliverable

No Change


Closing questions comments

Closing Questions/Comments

CPF Staff

State Dept – Mr. Weinz

PACOM

USARPAC

USNS MERCY

AUS HQ JOC

HQ JFNZ

JSDF

FISC-Yokosuka

  • C7F

  • C3F

  • CTF 76

  • 351st Civil Affairs Command

  • DLA Troop Support - Pacific

  • 30th NCR

  • HSC-23

  • MCAST

  • CDS-7


  • Login