Upto Bottom Foaming Project Monitoring - SHJ

Upto Bottom Foaming Project Monitoring - SHJ. ( Existing design  Bottom support LH/RH weld with side panel. 7/3/2013. 15/2/2013. 1/3/2013. 15/1/2013. 22/2/2013. 15/3/2013. 15/10/2012. 25/12/2012. Tool Ready & FPA. Samples from vendor. 1 st trial Finish. Foaming Bottom Ready

nikkos
Download Presentation

Upto Bottom Foaming Project Monitoring - SHJ

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Upto Bottom Foaming Project Monitoring - SHJ ( Existing design  Bottom support LH/RH weld with side panel 7/3/2013 15/2/2013 1/3/2013 15/1/2013 22/2/2013 15/3/2013 15/10/2012 25/12/2012 Tool Ready & FPA Samples from vendor 1st trial Finish • Foaming Bottom Ready • Sealing Tape application • method fix • Process finalization • PP lot of 50no Handmade samples preparation To check m/c feasibility Drawing preparation (new bottom panel) MP

  2. Bottom Bulging Improvement update

  3. Compressor base plate modification Compressor base modification • Thickness = 1.2 mm • Thickness = 1 mm

  4. Bottom support modification • Bottom support modified • Angle height 290mm dipping in foam. • All flanges are 25mm wide. • Angle height 254mm dipping in foam. • All flanges are 17mm wide.