Fms connectivity
This presentation is the property of its rightful owner.
Sponsored Links
1 / 10

FMS Connectivity PowerPoint PPT Presentation


  • 41 Views
  • Uploaded on
  • Presentation posted in: General

FMS Connectivity. Customer Advisory Board Meeting Las Vegas – December 12, 2006 Presented By: Denise Quirarte Kansas City Financial Center. Topics. Connectivity for Disaster Recovery Purposes PAM - Kansas City Regional Operations Center (KROC) as Primary Payment Processing Site

Download Presentation

FMS Connectivity

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Fms connectivity

FMS Connectivity

Customer Advisory Board Meeting

Las Vegas – December 12, 2006

Presented By:

Denise Quirarte

Kansas City Financial Center


Topics

Topics

  • Connectivity for Disaster Recovery Purposes

  • PAM - Kansas City Regional Operations Center (KROC) as Primary Payment Processing Site

  • Decommissioning of Hyattsville Regional Operations Center (HROC).


Currently

Currently

  • Majority of payment processing is done on the HROC platform (with the exception of SSA/SSI Monthly payments which process on KROC).

  • Customer agencies transmitting bulk files have a dedicated line or Frame Relay connection to HROC.

  • Several customer agencies have dedicated lines or Frame Relay connections to both HROC and KROC (for contingency).


Currently1

Currently

Current Connectivity

KROC

HROC

FPA

Few Agencies

Most Agencies


What s coming

What’s Coming

  • PAM will process all payments on KROC. Processing will be implemented in releases between 2007 and 2009.

  • HROC is being decommissioned Sept 2009.

  • KROC will be the primary processing site.

  • Bureau of Public Debt (BPD) will become the contingency processing site.


Preferred connectivity method

Preferred Connectivity Method

  • The Preferred method of implementation is IP over Sprint’s MPLS Private Internet Protocol (PIP).

    • Note: Sprint is discontinuing Frame Relay.

  • This method provides connectivity to HROC and KROC now and KROC and BPD in the future.


What s coming1

What’s Coming

  • Future Connectivity

KROC

BPD

SPRINT (MPLS) PIP

FPA


Benefits of mpls

Benefits of MPLS

  • Reduces Network Connections

    • Only requires one line from the agency to Sprint.

  • Better Contingency Management

    • Connectivity to the contingency site eliminates the need for cartridge or CD use if the primary site is down.

  • Switchover in a contingency is transparent to the Agency


Next steps

Next Steps

  • Verification and documentation of current connectivity:

    • KFC has contacted each Agency that transmits Bulk Files

  • FMS Network Engineering:

    • Assist Agencies with questions and planning

    • Provides a connectivity guide as a reference (included)

    • Will provide a customized network proposal.

    • Please identify yourself as a KFC customer.

  • KFC:

    • Performs testing with the Agency following line installation.

    • Will work with each Agency to ensure adequate connectivity is in place prior to the upcoming FMS changes.


Contacts

Contacts

  • KFC:

    • Paul Jackson816-414-2310

      [email protected]

    • Eugene Phillips816-414-2328

      [email protected]

  • Network Engineering:

    • Joseph Mendez202-874-7099

      [email protected]


  • Login