SBS Magnet and Infrastructure. Magnet Steel – machining in progress – vendor delivery on schedule for April- milestone April 2014 Racetrack Coils – 1 st coil to be delivered in May- milestone April 2014

Download Presentation

SBS Magnet and Infrastructure

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Sbs magnet and infrastructure

SBS Magnet and Infrastructure

  • Magnet Steel – machining in progress – vendor delivery on schedule for April- milestone April 2014

  • Racetrack Coils – 1st coil to be delivered in May- milestone April 2014

  • New Saddle Coil – revised drawings in review – rebidding procurement in early March- milestone April 2014

  • Magnet Assembly Hardware – Hardware defined – procurement on hold until confirmed that BNL will not ship existing hardware- milestone September 2014

  • Magnet Support Structure – Redesigned to get cost under $100k - analysis and drawings progressing – start procurement by end of March- milestone July 2014

  • Power Supply – parts ordered by vendor – delivery in late June – installation in Summer 2014- milestone September 2014

  • Beam line – continuing analysis to define shielding , solenoids and correctors – preliminary concept evaluated for cost – milestones Jan & Apr 2015

  • Field Clamps – upstream and downstream clamp material defined – details of design to be analyzed before procuring- milestones April 2015

  • Magnet commissioning in Testlab– milestone September 2014