Www.bristoltemplequarter.com
This presentation is the property of its rightful owner.
Sponsored Links
1 / 10

bristoltemplequarter PowerPoint PPT Presentation


  • 47 Views
  • Uploaded on
  • Presentation posted in: General

www.bristoltemplequarter.com. www.bristoltemplequarter.com. Facts, objectives and targets. One of the largest regeneration projects in the UK Covers 70 hectares of land in the centre of Bristol with Temple Meads railway station at the heart

Download Presentation

bristoltemplequarter

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Bristoltemplequarter

www.bristoltemplequarter.com


Bristoltemplequarter

www.bristoltemplequarter.com


Facts objectives and targets

Facts, objectives and targets

  • One of the largest regeneration projects in the UK

  • Covers 70 hectares of land in the centre of Bristol with Temple Meads railway station at the heart

  • Superb opportunity to create an iconic gateway to Bristol and the West of England through a 21st century station

  • Focus on creative, digital, low carbon sectors and financial and business services

  • Target: 4,000 jobs in 5 years and 17,000 by 2037

  • Potential to develop 240,000 sq m of new or refurbished space featuring offices, homes, retail, and a redeveloped railway station

www.bristoltemplequarter.com


Bristoltemplequarter

Achievements to date

  • Over 650 jobs in the zone

  • £7m of private sector investment to create Temple Studios, for creative industries, next to Temple Meads

  • Over £22m of public funding for 17 infrastructure projects including the Engine Shed scheme

www.bristoltemplequarter.com


Bristoltemplequarter

Achievements to date

  • Work started on £35m speculative office development at 2 Glass Wharf

  • Range of temporary use and animation projects – Creative Common and Severnside Project

www.bristoltemplequarter.com


Bristoltemplequarter

Infrastructure plans

  • £91m 12,000 capacity arena on Diesel Depot site

  • HCA new £11m bridge to ‘unlock’ the site

  • Operator to be selected in 2014

  • Construction -early 2016

  • Completion – 2017

www.bristoltemplequarter.com


Bristoltemplequarter

Infrastructure Plans

  • Delivery of Metrobus and Metrorail by 2017

  • Delivery of Gigabit Bristol project

www.bristoltemplequarter.com


Spatial framework

Spatial Framework

  • Designed to bring the Zone to life, connecting it to the rest of the city

  • Will provide design guidance for developers

  • Working alongside Network Rail and the masterplan for the railway station

  • Working with the Homes and Communities Agency

  • Working with transport teams to develop the infrastructure network

  • A real opportunity to create a new entrance to the city

www.bristoltemplequarter.com


The view towards temple meads in 2037

The view towards Temple Meads in 2037

www.bristoltemplequarter.com


An aerial view of temple meads in 2037

An aerial view of Temple Meads in 2037

www.bristoltemplequarter.com


  • Login