An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. HuntsPointMicrogrid Study (2015)

  2. [!JProducemarket NewYorkCityTerminalProduceCooperativeMarket DMeatmarket HuntsPointCooperativeMeatMarket DFish market h VoluntaryCleanupsite FultonFishMarkelalHuntsPoint DLeasedbuilding C:::JUtilityeasement £ Leaseholdboundary ProposedSouthBronxGreenway Proposedone-wayFoodCenterDrive N 1' NewYorkCity EconomicDevelopmentCorporation

  3. LandOwnership inFloodZone (2050)

  4. ExistingInfrastructure

  5. 2014 MicrogridLoads

  6. Existing(2014)MonthlyDemand 2014 ElectricalDemand(kWp/month) MeatMarket Fish MarketProduce Market Community Facilities 7,000 6,000 5,000 4,000 3,000 2,000 1,000 - kWp Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

  7. HourlyDemandFishMarket Hourly Loads Fish Market Typical SummerDayTypicalSpring/Fall Day Typical WinterDay 2500 2000 1500 1000 500 0

  8. GrowthAssumptions

  9. 2030 Microgrid ElectricalNetwork

  10. ProposedMicrogrid SteamNetwork 2030 Microgrid ThermalNetwork

  11. GeneratingElectricAssets(2030)

  12. EnergyandMaterialFlows Wholesale Markets Steam Electricity NaturalGas CHP Anaerobic Digester Vertical Farming Organic Waste

  13. ParcelD • Energy Center(2.5acres) • CoGen • MGSwitchgear • Transformers • Office • VisitorCenter • Parking/Dock • VerticalFarm(2acres) • GrowOperations • • 50,000SF • Warehouse • LoadingDock • Parking • Anaero.Digester(2acres) • 10,000SFOffice • • 20,000SF WH • Digesters • LoadingDock • Parking • Barges

  14. Further Information: • Hunts Point NY Prize MicrogridStudy Report: https://www.nyserda.ny.gov/-/media/NYPrize/files/studies/15-Hunts-Point.pdf • Hunts Point Resiliency Project site (up to date status): https://medium.com/hunts-point-resiliency • NYC Economic Development Corp. resources on Hunts Point Resiliency: https://www.nycedc.com/project/hunts-point-resiliency-implementation