1 / 32

EURO 

EURO . A High Intensity Neutrino Oscillation Facility in Europe. Introduction Superbeam Neutrino Factory Beta beams Detectors Physics Possible next steps. EUROnu. FP7 Design Study

nida
Download Presentation

EURO 

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. EURO A High Intensity Neutrino Oscillation Facility in Europe • Introduction • Superbeam • Neutrino Factory • Beta beams • Detectors • Physics • Possible next steps

  2. EUROnu • FP7 Design Study • Due to limited funds: focus on possible “next” generation neutrino oscillation facilities in Europe • CERN to Frejus superbeam • Neutrino Factory (in collab. with IDS-NF) • Beta beams • + performance of baseline detectors and physics reach • Output: comparison of physics, “cost” & risk • Reported to CERN Council via SG/ECFA • Project started: 1st September 2008 • Duration: 4 years – completion in August 2012

  3. Partners

  4. Structure

  5. EUROnu Status • Baselines largely defined • Design work still continues • Moving more towards “engineering” • Costing: • WBS being done • Framework being created using cost tool • Workshop planned soon • Safety and risk also to be done • Midterm technical review taking place • 19 months left!

  6. Super-Beam • Design of CERN to Frejus SB based on SPL

  7. Super-Beam • Design of CERN to Frejus SB based on SPL • Parameters: • 4MW beam: HP SPL • 5 GeV k.e. protons • 130Km baseline • Focus on solution for target + collector • Determine performance for Physics reach

  8. SB - Target • Preference: static solid target • Mercury jet – non-starter: • needs magnetic field containment • interaction with horn • not simple • Low Z and 4 targets: small extrapolation • Initial thoughts: 4*single graphite/beryllium target

  9. SB - Target

  10. SB - Target Pebble-bed target

  11. SB - Horn • Baseline: • Miniboone shape • Aluminium • Cooled with internal water jets • Pulsed with 300-350kA • Looks fine from stress and fatigue • Lifetime due to radiation needs study

  12. SB - Horn Very preliminary

  13. Neutrino Factory • Close collaboration with IDS-NF • IDR almost ready Muon front-end Muon acceleration

  14. NF – Pion capture

  15. NF – Pion capture

  16. NF – Pion capture

  17. NF – Pion capture

  18. NF – Front-end Status: - advanced - awaiting MICE results - RF studies - alternatives under study

  19. 244 MeV 0.9 GeV 146 m 79 m 0.6 GeV/pass 3.6 GeV 264 m 2 GeV/pass 12.6 GeV The linac consists of SC RF cavities and iron shielded SC solenoids grouped into three types of cryo-modules. NF – Acceleration LINAC RLA I RLA II Chicanes have a vertical dipole spreader, horizontal bending magnets, quadrupoles for transverse focussing and a vertical dipole combiner. The RLAs consist of single SC RF cavity cells and FODO quadrupole focussing throughout.

  20. NF – Acceleration Non-scaling FFAG: Conceptual design advanced. Engineering being started. But, no such machine ever built. Commissioning underway.

  21. Beta-Beam • Main issue in EUROnu: maximise ion production • 2 options being considered

  22. EURISOL Beta Beam:18Ne and 6He BB – Ion production • Production • ISOL method 18Ne 2x1013/s<8x1011/s6He 2x1013/s>1x1013/s • direct production being studied • Updated Beta Beam: 8Li and 8B – higher Q isotopes • ion production ring 8Li 1014/s 8B >1013/s

  23. BB – Ion production But: >5* more ions – difficult to accelerate 8B looks very difficult 18Ne looks possible, though experiment required

  24. BB – Ion production New baseline Work continues to optimise ion production rate

  25. BB – Ion production Possible Needs experiment Challenging

  26. Limited funding: only performance and “cost” • Concentrate on baseline detectors • Magnetised Iron Neutrino Detector - NF • Large water cherenkov – SB and BB • Near detectors • Hoped Laguna would be able to do LAr, e.g., ! Detectors

  27. 50-100 m 15 m n beam 50-100kT 15 m B=1 T iron (3 cm) + scintillators (2cm) • Golden channel signature: “wrong-sign” muons Detectors - MIND IDS-NF baseline for 25 GeV NuFact: MIND • Far detector: 100 kton at 2000-4000 km • Magic detector: 50 kton at 7500 km • Appearance of “wrong-sign” muons • Segmentation: 3 cm Fe + 2 cm scintillator • 1 T magnetic field

  28. New analysis with Nuance and GEANT4: signal efficiencies • Systematic errors: ~1% • Background: ~10-4 Detectors - MIND Numu efficiency Anti-numu efficiency

  29. MEMPHYS: 3x65mx60m water Cherenkov modules (400 kton fiducial) but could be expanded to 3x65mx80m (572 kton) • Either SPL Super Beam or CERN Beta Beam to Frejus tunnel in Modane, France, 130 km from CERN. • 81,000 12” PMTs (30% coverage) Detectors - WC MEMPHYS 440 kt 65m 60m EuroNu, RAL, 19 January 2011

  30. R&D underway: new PMTs and readout electronics • Prototype: MEMPHYNO under construction • New WC simulation Detectors - WC MEMPHYS: interactive μ+500 MeV

  31. Physics performance • Optimisation: • baselines and energies • synergies: experimental setups and facilities • Systematics Physics

  32. Next Steps • Technical review: April/May • ECFA Neutrino Panel • Independent assessment • IDS-NF IDR • EUROnu annual report • CERN Strategy Review: kick-off this summer report next summer • EUROnu contribution under discussion • EUROnu future: also under discussion

More Related