At the beginning there were two canals:
Download
1 / 24

At the beginning there were two canals: - PowerPoint PPT Presentation


  • 107 Views
  • Uploaded on

At the beginning there were two canals: Canal Forth and Clyde was built in 1777 between harbors Grangemouth and Falkirk connecting Glasgow with west cost of Scotland. Canal Union between Falkirk and Edinburgh was finished in 1822.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about ' At the beginning there were two canals:' - nickan


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript

At the beginning there were two canals:

Canal Forth and Clyde was built in 1777 between harbors Grangemouth and Falkirk connecting Glasgow with west cost of Scotland.

Canal Union between Falkirk and Edinburgh was finished in 1822.

Because of geographical difficulties, which created a difference of 79ft.in elevation, the two canals were connected by 11 locks.


In 1963, after 150 yrs of existence of this water way with 11 locks the construction of a huge water carousel started. This extraordinary idea was finished in 2002 and became a symbol of Scotland. This invention saves not only time but also energy.


This is the only rotational boat transporter in the world. It has two arms and each arm forms a kind of huge tub filled with water. Boats enter the tub, then the tub locks up and the huge arm starts rotating .


lower canal It has two arms and each arm forms a kind of huge tub filled with water. Boats enter the tub, then the tub locks up and the huge arm starts rotating .


Entrance to lower canal It has two arms and each arm forms a kind of huge tub filled with water. Boats enter the tub, then the tub locks up and the huge arm starts rotating .


A Boat is approaching the “tub” It has two arms and each arm forms a kind of huge tub filled with water. Boats enter the tub, then the tub locks up and the huge arm starts rotating .


35 m It has two arms and each arm forms a kind of huge tub filled with water. Boats enter the tub, then the tub locks up and the huge arm starts rotating .

There are boats in both “tubs” upper and lower


Rotation is starting It has two arms and each arm forms a kind of huge tub filled with water. Boats enter the tub, then the tub locks up and the huge arm starts rotating .


Boats in both rotating arms It has two arms and each arm forms a kind of huge tub filled with water. Boats enter the tub, then the tub locks up and the huge arm starts rotating .


rotation It has two arms and each arm forms a kind of huge tub filled with water. Boats enter the tub, then the tub locks up and the huge arm starts rotating .


Otáčení... It has two arms and each arm forms a kind of huge tub filled with water. Boats enter the tub, then the tub locks up and the huge arm starts rotating .


Just before “landing” It has two arms and each arm forms a kind of huge tub filled with water. Boats enter the tub, then the tub locks up and the huge arm starts rotating .


Closing the gate , regulation of level of water and “tubs” rotation

Takes 15 min. only.



The “tubs” are filled according the Archimedes’ Law. 300 tons.

So the weight of “tubs” are balanced.

To open the upper and lower lock and turn the whole system

by 180◦ they need an engine of 22.5 kW which only use 1.5 kWh