slide1
Download
Skip this Video
Download Presentation
ggonzale:

Loading in 2 Seconds...

play fullscreen
1 / 11

ggonzale: - PowerPoint PPT Presentation


  • 53 Views
  • Uploaded on

ggonzale:. ggonzale:. Herschel PACS Instrument Qualification Review Review Objectives and Organisation. G.Crone/G.Pilbratt Herschel/Planck Project. Instruments Review Cycles in Perspective. Spacecraft ITT SRR PDR CDR …

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about ' ggonzale:' - nichole-snider


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
slide1

ggonzale:

ggonzale:

Herschel PACS Instrument Qualification ReviewReview ObjectivesandOrganisation

G.Crone/G.Pilbratt Herschel/Planck Project

PACS IQR - SCI-PT/33202

instruments review cycles in perspective
Instruments Review Cycles in Perspective

Spacecraft ITT SRR PDR CDR …

Phase B Phase C/D Launch

Instruments: ISVR IIDR IBDR IHDR IQR … IFAR

1999 2000 2001 2002 2003 2004 2005 2006 2007

PACS IQR - SCI-PT/33202

from qualification to flight acceptance
From Qualification to Flight Acceptance
  • CQM at module (EQM) level :

Delivery (DRB)  Test readiness (TRR)  Test review (PTR) 2005

After CQM System Campaign hold a Instrument Status Review

  • FM at instrument level:

ILT TRR  ILTs  ILT Test review prior to warm-up (PTR) 2005

To decide on need for further tests or to terminate & deliver

  • FM at module (PLM) and system level:

Delivery (DRB)  Test readiness (TRR)  Test review (PTR) 2006

In preparation of FAR Instrument Status Review

PACS IQR - SCI-PT/33202

herschel status
Herschel Status
  • Herschel Payload Module CDR completed in July and Space Segment CDR completed in October with official close-out end 2004
  • Herschel EQM - Ready for Herschel CQM Focal Plane Units.
  • All Herschel Instruments: HIFI, PACS and SPIRE have successfully completed CQM Instrument Level Tests.
  • All instruments delivered and in ASED OTN. (N.B. SPIRE to be returned 17th January)
  • Instrument testing to commence April 2005
  • Instrument FM program underway – Baseline delivery Nov 2005

PACS IQR - SCI-PT/33202

herschel eqm
Herschel EQM

PACS IQR - SCI-PT/33202

herschel pfm status
Herschel PFM status
  • All units passed CDR, manufacturing well underway
  • Optical bench delivered
  • HTT delivered, most cryo-components, instrumentation, MLI integrated
  • HOT delivered instrumentation, cryo-components and MLI mounted. Tank integrated on framework. Both fully integrated
  • Cylinder thermal shields delivered-Others completed
  • CVV cylinder delivered-Upper and lower bulk head imminent.
  • Integration to be completed by May 2005; first cool-down with MTD instrument prior to shipment to ESTEC for STM campaign

PACS IQR - SCI-PT/33202

instrument qualification review objectives
Instrument Qualification Review - Objectives

Ref: IQR Proceedings - v2 Aug 26, 2004 - SCI-PT/27108

  • Confirmation of instrument CQM hardware/software qualification
  • Completion of instrument design verification
  • Assessment of performance and compliance with sci. reqs
  • Identification and confirmation of improvements for FM
  • Completion of OBSW design and demonstration of functionality
  • Confirmation of EGSE design and demonstration of functionality
  • Confirmation of instrument operability - User Manual

PACS IQR - SCI-PT/33202

iqr proceedings
IQR - Proceedings

Data Package – complete delivery at K.O. [PACS]

  • Documents as identified in SCI-PT/27108
  • Presentations as given during the K.O. meeting

Review of Data Package [Board]

  • Discrepancies and open issues raised as RIDs
  • RIDs issued up to one week before co-location

Answersto RIDs [PACS]

  • Provided, discussed and resolved at co-location

Board Report = Result of the three items above [Board]

PACS IQR - SCI-PT/33202

iqr timeline
IQR Timeline

K.O. Meeting and Data Pack today

Preliminary feedback 18 Jan 2005

Issue of RIDs 02 Feb 2005

Co-location 10-11 Feb 2005

Issue of Board Report 25 Feb 2005

PACS IQR - SCI-PT/33202

review board representatives of third parties
Review Board / Representatives of third parties

Herschel/Planck Project (ESTEC)

G. Crone (chair)

G. Pilbratt (co-chair)

A. Heske (secretary)

P. Estaria

J. Rautakoski

F. Pedersen

T. van der Laan

Industry Representative

G. Doubrovik (Alcatel)

SPIRE Representative

B. Swinyard (RAL)

Funding Agency Representatives

M. Falvella (ASI)

K. Mercier (CNES)

K. Proetel (DLR)

H. Schroeven-Deceuninck (Prodex)

Experts

D. Schink (Astrium)

B. Collaudin (Alcatel)

G. Coe (ESTEC)

F. Marliani (ESTEC)

PACS IQR - SCI-PT/33202

pacs iqr k o agenda
PACS IQR K.O. - Agenda

09:00 Welcome MPE

09:05 Review Organization and Objectives ESA

09:15 Introduction – IHDR close-out and docs MPE

09:45 Instrument Qualification Status and plans for PFM MPE

Mechanical, Thermal, Electrical I/Fs and EMC, Optical

11:45 PhFPU Qualification and plans for PFM CEA

12:15 Ge:Ga detector arrays Qualification MPE

with Coffee Break at 11:00

12:45 Lunch

13:45 On-Board Software and UM MPE

14:15 EGSE, I-EGSE and MIB MPE

14:25 CQM/AVM ILT Results MPE

15:30 PA/QA Status MPE

15:40 Management and Schedule MPE

15:55 Critical Items and next steps MPE

16:15 Lessons learnt from CQM Integration in Industry MPE

16:30 Questions and Clarifications All

17:00 First Impressions and Feedback ESA

with Coffee Break at 15:15

PACS IQR - SCI-PT/33202