1 / 1

Internal erosion

Experimental study on limitation of progression of Internal Erosion in Zoned Dams. Importance of theme. Testing methodology. 1. 4. Failure modes in embankment dams. C rack F illing E rosion T est. Over- topping. Internal erosion. 46%. 48%. Setup. Laboratory device. 3.

Download Presentation

Internal erosion

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Experimental study on limitation of progression of Internal Erosion in Zoned Dams Importance of theme Testing methodology 1 4 . Failure modes in embankment dams Crack Filling Erosion Test Over- topping Internal erosion 46% 48% Setup . Laboratory device 3 Objective of study 2 Crack Filling → Example Influence of the upstream zone in limiting the progression of erosion Developed test cell CFET Ricardo Santos PhD student ricardos@lnec.pt Geotechnical department Upstream material Downstream filter Steps for specimen preparation in the CFET Flow Limiting FLET Allows for twoErosion Tests Results /Conclusion 5 Typical results CFET 4 0 + 5 min + 45 min

More Related