The Merton Rule & Beyond
Download
1 / 11

Climate Change Strategy Overview 8 key themes Aims to deliver 60 CO2 reductions by 2050 Long term strategy, with short - PowerPoint PPT Presentation


  • 107 Views
  • Uploaded on

The Merton Rule & Beyond 30 May 2008. District Heat & Power. Ray Morgan Chief Executive. Woking Borough Council. The Merton Rule & Beyond. Climate Change Strategy Overview 8 key themes Aims to deliver 60% CO 2 reductions by 2050 Long term strategy, with short and medium term targets

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'Climate Change Strategy Overview 8 key themes Aims to deliver 60 CO2 reductions by 2050 Long term strategy, with short' - nevin


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript

The Merton Rule & Beyond

30 May 2008

District Heat & Power

Ray MorganChief Executive

Woking Borough Council


The Merton Rule & Beyond

Climate Change Strategy Overview

  • 8 key themes

  • Aims to deliver 60% CO2 reductions by 2050

  • Long term strategy, with short and medium term targets

  • Regular progress reports to cross-party group


The Merton Rule & Beyond

Leadership, Vision and Strategy in Embedded Generation

  • Energy Efficiency Report 1990/91

  • £250,000 fund for energy efficiency measures

  • Innovative sustainable and renewable energy projects

  • Building Combined Heat, Power & Cooling facilities

  • Thameswey Ltd and Thameswey Energy Ltd


The Merton Rule & Beyond

XERGI SERVICES LTD

Thameswey Group Corporate Structure

WOKING BOROUGH COUNCIL

20%

100%

80%

10%

THAMESWEY ENERGY

LIMITED

XERGI LTD.

THAMESWEY LIMITED

90%

100%

100%

100%

THAMESWEY CENTRAL

MILTON KEYNES LIMITED

ECSC

WOKING BOROUGH HOMES LIMITED


The Merton Rule & Beyond

Embedded Generation Objectives

  • C02 emission reduction objective based on Royal Commission on Environmental Pollution’s targets: 60% by 2050 and 80% by 2100

  • Series of energy efficiency measures

  • Local embedded sustainable generation of heat and power

  • Sustainable energy target – 100%

  • Renewable energy target – 20%


The Merton Rule & Beyond

Power

Chilled Water

Hot Water



The Merton Rule & Beyond

The Hoe Valley development


The Merton Rule & Beyond

Oak Tree Road – retrofit demonstration house


The Merton Rule & Beyond

The Council’s Achievements

Corporate

  • Energy Consumption Savings (2007) 51%

  • C02 emission reductions (2007) 81%

  • Sustainable Energy Self Generation (2006) 94%

  • Renewable Energy Self Generation (2006) 4%

    Borough Wide

  • Energy efficiency of residential property (up to 2007) 33%

  • C02 emission reductions (2007) 21%

  • Number of households assisted with

    energy conservation grants (1996 – 2007) 4,974

    Baseline 1990/91


Woking Borough Council

Thinking Globally, Acting Locally

The Merton Rule & Beyond


ad