Graz-Reininghaus Resilient Urban Development

Graz-Reininghaus Resilient Urban Development. On Behalf of. 4x4. 4 Potentials 4 Precepts 4 Urban Bricks 4 Milestones. City Center. Enlargement of the City Center. 4 Potentials. 4 Precepts. 4 Urban Bricks. 4 Milestones. Initial Situation Transport.

nerice
Download Presentation

Graz-Reininghaus Resilient Urban Development

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Graz-ReininghausResilient Urban Development On Behalf of

  2. 4x4 • 4 Potentials • 4 Precepts • 4 Urban Bricks • 4 Milestones

  3. City Center Enlargementofthe City Center • 4 Potentials

  4. 4 Precepts

  5. 4 Urban Bricks

  6. 4 Milestones

  7. Initial Situation Transport • (1) Road network at/over limits of capacity • (2) Additional traffic volume by new urban developement • (3) Only possible with minimised modal share of car traffic • +0,6 up to +1,0 Mio. sqm • gross floor area • +14.000 up to +25.000 persons • (inhabitants, employees) • +15.000 up to +70.000 car trips per day

  8. Measures • (1) Traditional transport planning: improvement of infrastructure of all modes • (2) Management of mobility of new developement: Limiting car traffic by • Limiting the number of parking lots in the whole developement and in single quarters • Limiting the number of car trips

  9. Mobility management:Objective for developement / all quarters • Detailedobjectivesforaccessibilityofquarters incl. bicycle, pedestrians, cars, p.t. • Collective garagesand max. numberofparking lots • Limits ofnumberoftripsbycar in thedevelopementand in all quarters • Calculation model fornumberoftripsbycarandparking lots, depending on sqm

  10. Mobility ContractOwner/developer– City of Graz • Limiting the number of car trips, number of parking lots • Definitions for „allowed“ amount and kind of „use“ (e.g. no shopping centers), limit of number of sqm • Definition of necessary measures and time schedule, responsibility and costs – infrastructure and mobility management • Signed by all contract partners

  11. Summary • „Wider“ approach on Mobility Management for car-reduced city developement • The only possibility of urban developement in overloaded road networks • Essential point: Mobility Contract and reliability against contract violation • Only the future will show the long-term effect and reliability of Mobility Contracts

  12. Stadt Graz:Stadtbaudirektion der Stadt GrazStadtbaudirektor DI Mag. Bertram Werle, DI Kai-Uwe HofferStadtplanungsamtAV DI Michael Redik, DIEva-Maria BenediktAbteilung für Grünraum und GewässerAV DI Robert Wiener, DI RadlAbteilung für Verkehr AV DI Martin Kroissenbrunner, DI Barbara Urban

  13. Planungsteam:Externe Leitung:kleboth lindinger partnersKleboth.Lindinger ZT-GmbHDI Ina Granzow, DI Katharina Karoshi, Andreas KlebothStadtplanung:ARGE BRAMBERGER [architects] & Atelier Thomas Pucher ZT GmbHArchitekt DI Alfred Bramberger, Architekt DI Thomas Pucher, Grün- und Freiraum:StadtlandDI Herbert Bork, DI Gitti Dorfstätter, Univ. Prof. DI Sibylla ZechVerkehr:ZIS+P VerkehrsplanungSammer&Partner Ziviltechnikergesellschaft m.b.H.Dr. Gerald Röschel

  14. Thankyou • foryourattention!