1 / 4

EATM Contribution - NA62

Lau Gatignon, 19 February 2013. EATM Contribution - NA62. K12 / ECN3. The ECN3 crane renovation has been completed with a reception test on the 25 th of January and a second final approval last week.

nedra
Download Presentation

EATM Contribution - NA62

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Lau Gatignon, 19 February 2013 EATM Contribution - NA62

  2. K12 / ECN3 • The ECN3 crane renovation has been completed with a reception test on the 25th of January and a second final approval last week. • NA62 wants to perform a field map of the MNP33 magnet in the course of 2013, the preferred period being around September/OctoberIs this possible (power, cooling?) • At some stage the front end alignment needs to be checked, the 4th MTR turned by 180o and T10 to be consolidated.

  3. ECN3 Installation planning (1)

  4. ECN3 installation planning (2)

More Related