An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. WCCUSD Bond ProgramConstruction Update Pinole Valley High School Interim Campus 08/12/2014

  2. Pinole Valley High School Interim CampusSite Plan

  3. General Contractor JUV, Inc. • Architect of Record WLC Architects • Construction Managers SGI Construction Management • Eddie Law • Marc Alojepan • Verna Van • Inspector of Record Mark Eriksen Pinole Valley High School Interim CampusProject Team

  4. Contract Amount $5,530,000 • Notice of Award 03/19/14 • Notice to Proceed 04/07/14 • Duration 130 days • Completion Date 08/15/14 Pinole Valley High School Interim CampusProject Team

  5. Concrete poured at all retaining walls and walkway (final pour on-going) • AC paving (paving at front entrance area now and ramps) • Installation of fencing and gates – on-going • Power to all portables, final yesterday • Data line pull, termination, testing and labeling on-going • Fire alarm testing today • Installation of picnic tables and benches – on-going • Fire and domestic line chlorination (today), flush and bacteriological test • Installation of signage today • Kitchen health inspection conditional operational permit – Effective 8/8/2014 • Administration move and set-up – on-going • Teacher return/un-pack and classroom set-up – on-going • Final clean and AC striping – on-going Pinole Valley High School Interim CampusProject Status

  6. Administration Building

  7. Connecting Walkway Between Plateau and Main Campus

  8. Connecting Walkway Between Plateau and Main Campus

  9. Connecting Walkway Between Plateau and Main Campus

  10. Kitchen Building

  11. East Walkway to Plateau

  12. Perimeter Fencing

  13. Site Furnishings Under Shade Structure