An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Creation and Handover of O&M Asset Information Success Begins In The Starting Blocks Jim Humphries Vice President Performance Technology & Siting Services

  2. Creation and Handover of O&M Asset InformationSuccess Begins In The Starting Blocks Perhaps the first question is what information? Traditional Handover Materials: • Drawings • Equipment & instrument lists in flat files • Engineering specs • Vendor manuals • Vendor supplied spares info • Acceptance test records • QC, checkout & commissioning records

  3. Creation and Handover of O&M Asset InformationSuccess Begins In The Starting Blocks Perhaps the first question is what information? The Trend Is More: • Fully populated asset registers • HAZOPS & risk analyses • Electronic equipment parts lists • RAM models • FMEA & RCM data bases • O&M manual metafiles • PM procedures, RBI & predictive maintenance baselines, systems • O&M, supply chain, organizational strategies & philosophies • Training programs & simulators • Trained personnel • Life cycle cost forecasts & analyses • Management systems software fully populated & initialized • And more (ie whatever it takes to assist with operational readiness!)

  4. Creation and Handover of O&M Asset InformationSuccess Begins In The Starting Blocks Question 2: Creation and handover by whom to whom? • By EPC to Owner • By equipment vendors to EPC • By technology providers to EPC & Owner • By Owner to EPC (eg visions, strategies, business cases & historical operating data) • By niche service and software providers to EPC & Owner

  5. TOTAL OWNERSHIP COST IMPACTS Creation and Handover of O&M Asset Information Success Begins In The Starting Blocks FEL 1 FEL 2 FEL 3 ? Detailed Engineering Procurement Construction Commissioning,Startup, & Turnover First Operating Cycle TYPICAL CAPITAL PROJECT PROCESS Question 3: Optimal timing for creation and for delivery of the information?

  6. Creation and Handover of O&M Asset Information Success Begins In The Starting Blocks Benefits Of Commonly Accepted Answers To The Questions: • Enhanced efficiency of the Capital Project Supply Chain in delivery of O&M asset information (ie lower cost) • Less time and effort for Owners to prepare for Operational Readiness • Faster, smoother, safer startups • Lower initial and life cycle cost of operations

  7. Creation and Handover of O&M Asset Information Success Begins In The Starting Blocks Recommendations • Create an interest group of influential Owners, Equipment Suppliers, and EPCs who are chartered to establish new industry norms for creation and handover of O&M information for major capital projects. • Answer the three questions in sufficient detail to enable development of consistent and efficient work processes, software, and data bases • Focus on creating a model stage gate process with clarity on the typical deliverables for each stage and gate • In the short term, create and publish examples of flexible specifications for deliverables requirements including content, media, and timing rather than industry standards

  8. Creation and Handover of O&M Asset Information Success Begins In The Starting Blocks Questions Comments?