Transferring Datums. Temporary Bench Mark (TBM). Temporary Bench Mark (TBM) from which levels are taken. A Temporary Bench Mark (TBM) is a known height point from which all levels are taken. The TBM can be related to an Ordnance Survey Bench Mark. . The TBM can be surrounded by concrete

Download Presentation

Transferring Datums

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Slide1 l.jpg

Transferring Datums


Slide2 l.jpg

Temporary Bench Mark (TBM)

Temporary Bench Mark

(TBM) from which levels are taken

A Temporary Bench Mark (TBM)

is a known height point from which

all levels are taken.

The TBM can be related to an

Ordnance Survey Bench Mark.

The TBM can be surrounded by concrete

and a timber enclosure for protection.


Slide3 l.jpg

Ordnance Survey Bench Mark

Level taken from here

Ordnance Survey Bench Mark – datum which marks the height above mean sea level at Newlyn in Cornwall.

These datum's are established by the

Government Survey Office and are

usually permanently marked on public

building, bridges etc.


Slide4 l.jpg

Example of Ordnance Survey Bench Mark


Slide5 l.jpg

A Datum peg is a level point that is established in relation to a

Temporary Bench Mark.

The datum is a level reference point for the building activities, a few are shown

below.

Datum peg at

DPC level

DPC

Oversite

concrete

level

Foundation

concrete level

Invert level


Using straight edge and level l.jpg

Transferring Datums

Using Straight Edge and Level


Slide7 l.jpg

A

Mark the position of the level

on the straight edge to ensure

it remains in the same

position.

B

X

Drive a peg (X) in the lengths of the straight

away from the datum and level.


Slide8 l.jpg

B

X

A

Y

To maintain accuracy the spirit level

and straight edge should be reversed at each intermediate

leveling point as seen point B on the straight edge remains on peg X and

A swings round to peg Y.


Slide9 l.jpg

A

B

A


Slide10 l.jpg

Any inaccuracies in the level and straight edge are corrected by reversal

of the level and straight edge as illustrated below.

TBM

Peg 1

Peg 2

Peg 3

Peg 4

Datum Level