June 2009 Emergency Preparedness

June 2009 Emergency Preparedness. “Are you still thinking about me?”. AAR Comments:. Which Region had a lot to say? Which Agency had the most to say? What was said: Count by Major Issue - Total: 303 comments Communications 67 comments Plans 53 Comments Logistics 50 comments

naoko
Download Presentation

June 2009 Emergency Preparedness

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. June 2009 Emergency Preparedness

  2. “Are you still thinking about me?”

  3. AAR Comments: Which Region had a lot to say? Which Agency had the most to say? What was said: Count by Major Issue - Total: 303 comments Communications 67 comments Plans 53 Comments Logistics 50 comments Surveillance 49 comments Top 4 items: 171 comments Sort: Needs Work vs. Positive comment Internal/ External Communications 34 vs. 27 Sample Transport 26 vs.9 Supplies 3 vs. 2

  4. EMS • SNS Allocations- EMS services have stockpiled PPE for a Pan Flu event and took proactive measures in ordering additional supplies when the epidemic started. However, there may come a time where the demand would exceed the available supply in the private market and EMS has nothing to fall back on. A review of available PPE in the SNS is needed and this supply needs to be shared with all entities. (Hospitals, EMS, Nursing Homes, Etc.) • During Conference Calls all lines should be muted to eliminate interruptions.

  5. HOSPITALS Antivirals – • Many questions from facilities on what type and how much antivirals they received and why. No information about amount sent from SNS was available – hospital did not know what to expect and therefore was unable to reconcile with what was delivered. • Information about limits (can’t open the SNS package until go-ahead given by DHH, etc.) was provided AFTER shipment was received. • SNS medications were delivered directly to nursing homes. Concerns that no Pharmacist or MD is on site to manage the medication, and that NH is not likely to have a secure location for the medications. • At hospitals not all pharmacies are open on the weekend. This made it difficult to communicate with the hospitals to expect the National Guard/State Police to show up delivering medications and what to do with them. • After the antivirals were received some of the expiration dates are soon – June 2009. Need guidance on how to dispose/use. The other items that don’t expire – need guidance on what to do with them. • SNS Guidance needs to be communicated to physicians. Hospitals do not have a way to get the information out to every doctor – only doctor’s on their medical staff. • Hospital DRC’s did not get a list of who was receiving the SNS. If the list is shared with the DRC they can review the list to see if anyone was left off of the list in their region. • Now that the antivirals are not needed, hospitals need to know what to do with it. Need resolution. Hospitals don’t handle open well open ended question for a long time. May be less willing to accept distribution in the future. They need to be able to put it away or someone needs to pick it up. RECOMMENDATIONS • Should have gotten information from DRCs or used LHA directory. • Send out message (ex: 400 licensed beds plus 10%) -You will receive 440 treatment regimens; and provide a list that includes the quantity and type of drugs when cache is delivered to each facility as well as instructions on how to use and/or dispose of drugs. • TBD • Need to make sure that couriers have this in place at the beginning of an event

  6. Primary Care • Lack of a comprehensive physician networking system • Current efforts are piecemeal resulting in mis-communication, no communication, inaccurate information, depending on wrong people to get message out • Website not always up-to-date and required checking 3 different sites instead of one with links to others • Some regional HAN fax servers had limited volume capability and couldn’t add PCPs • Lab specimen transport protocol not designed for ease of use by PCPs – designed for rapid transport only • Not clear who/how to distribute testing kits to small clinics

  7. “Hurri-Flu” Task Force Mild Severe • Planning Scenario 1: Mild Flu Season Planning scenario one is based on a projected landfall of a Category 3 or higher hurricane anywhere on the coastline of Louisiana during a mild flu pandemic. A mild flu pandemic is identified as a mid-range pandemic severity index of one to two. • Planning Assumption: The State of Louisiana will use the H-Hour Timeline to manage the evacuation and sheltering of coastal Louisiana during a mild flu pandemic. • Planning Assumption: A Category 3 Hurricane will necessitate activation of Louisiana’s State Assisted Evacuation Plan. • Planning Assumption: A mild flu season may require standard infection control procedures ie. Mask be included as part of the standard kit on buses and at all shelters to be used for individuals who have respiratory symptoms such as coughing or sneezing) at parish pick-up points, buses, and shelters.

  8. “Hurri-Flu” Task Force Mild Severe • Planning Scenario 2: Severe Pandemic • Planning scenario two is based on a projected landfall of a Category 3 or higher hurricane anywhere on the coastline of Louisiana during a severe pandemic. A severe pandemic is based on a Severity Index 3 or higher. • Planning Assumption: The following confounding factors should be incorporated into the planning assumptions for a severe index pandemic flu scenario. • Other states will NOT absorb Louisiana’s residents; hence, LA will have to address “surge-within-borders” evac/shelter plan. • That out-of-state resources to come into the state and assist LA with support teams will NOT be forthcoming; hence, LA will have to rely on limited organic resources to implement the evac/shelter plan. A COOP Plan should be considered to identify essential services for the evac/shelter plans. • Up to 40% or more of the population will have flu-like-illness hence it will be difficult to separate out populations. Hygiene and wearing a mask for everyone should be a requirement.

  9. Anticipated Fall Resurgence DRAFT MODELS are below for discussion with Parish Directors next week. ***************************************************************************************** Purpose: The following models were developed to frame levels of expected engagement by other ESF’s. Planning Assumptions: In all models, the need for an incredibly effective communication strategy will be needed. 1. Normal Pattern 2. State based Distribution of plentiful vaccine. • Limited vaccine • In-Extremis Plan (the Pandemic Flu Model)

  10. “I’ll be back!”

  11. Hurricane Preparedness 2009

  12. Confidential Data Enclosed: Not for wide-spread/public distribution SHELTERING REGIONS:Region 6, 7 and 8 (and 9)

  13. 8 7 6 9 2 4 5 3 1 Special Needs Shelter Network – 2008 Region 1: Evacuation Processing Center Region 2: Baton Rouge + federal augmentation Region 3: Thibodaux Region 4: Lafayette Region 5: McNeese Region 6: Alexandria + federal augmentation Region 7: Shreveport/ Bossier Region 8: Monroe + federal augmentation Region 9: Hammond Confidential Data Enclosed: Not for wide-spread/public distribution Note: The sequential opening of these shelters is dependent upon need; MSNS shelters – as are all shelters - are not opened concurrently.

  14. Critical Transportation Needs Shelters (CTNS)

  15. 8 7 Critical Transportation Needs Shelters (CTNS) - 2009 Primary lead: Department of Social Services Target: general population based shelters for transportation challenged (shelters which buses will be directed) Region 7 – five (5) sites in Caddo Region 8 – two (2) sites in Morehouse Region 6 – one (1) site in Rapides Current Capacity 2009: 8,000 State-operated CTNS 3,400 Parish-operated CTNS 6

  16. Medical Institution Evacuation PlansPRE-STORM EVACUATION PROCESS

  17. What is the potential throughput? Number of Parishes: 12 Number of Hospitals: 60+ Regions 4,5: 624 patients Regions 3,4: 343 patients Regions 1,3,9: 1063 patients Anticipated Planning Range: low - high 343 - 1063 (reasonable “worst case” planning scenarios)

  18. Abbreviated Timeline H-hour: • 120: Lean Forward! Email alerts, notifications distributed, communications check • 72 : Flag goes up! All levels of government (local, state, federal) must watch this storm and be ready to mobilize an AMP.Form 1 is used to identify potential volume of patients so that number of aircraft can be estimated and organized for potential activation. • 72- 54 Continuous updates to Form 1. Refinement of data as threat becomes more imminent. Based on the direction and threat of the storm, AMP(s) are activated. • 54: “No-kidding” numbers are ascertained. • 48: Wheels-up! The first load of patients should be enroute to FCC • 18: Clearing the Battlefield. A meter-check is determined to see how many patients still require evacuation. This is the last chance to make any corrective actions. SMART listing identified. • 12: AMPs CLOSED

  19. Hot Topics - 2009 • Triage/ Definition of “special needs” • Medical Support in CTNS • Hurri-Flu Task Force