1 / 7

Lsst Laboratoire de l’accélérateur linéaire

Lsst Laboratoire de l’accélérateur linéaire. Jimmy Jeglot , Vanessa Tocut, François Wicek. LAL Orsay.

Download Presentation

Lsst Laboratoire de l’accélérateur linéaire

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Lsst Laboratoire de l’accélérateur linéaire Jimmy Jeglot, Vanessa Tocut, François Wicek LAL Orsay

  2. Banc de test CABACfirmware acquisition (Horloge et bias): codage vhdl Simulation ok Intégration en cours2 x Carte fille Conversion (14 adc lents 2 rapides et 2 DAC): Schématique en coursAppro en 2011 ~ok fab à payertests et validation2 picoscopes (200Mhz) 2 x1 329 € HT X Centaines de litre d’azote Alimentation Bias Carte Cyclone 3 en stock = Achat à prévoir en 2012

  3. Banc de test « TEST_0 »Carte chaude avec supportFabrication payée 2011TestsRécupération carte DIO ? 20 voies pmd 120Usb IO / voir PMD 120 NI USB-6501 (24 voies, 8.5 mA) Matériel d'E/S numériques USB Yamaichi 2x QFN 36 en stock

  4. Banc de test ASPIC 2test de bruit ISO3test BEB firmware v4 (free running + adc synchro)test xtalk (mémoire)Validation pogo pin à froid (en cours au Lal)

  5. ASPIC 2 Banc de test

  6. ASPIC2: main results

  7. Banc de test ASPIC 3Aspic3 juillet 2012Fin 2012: Carte chaude/ froide Modification BEB 2 TestsFabrication, outillage, et pièces à prévoir

More Related