Slide1 l.jpg
This presentation is the property of its rightful owner.
Sponsored Links
1 / 14

FIRST CAPACITY BUILDING WORKSHOP ON CLEAN DEVELOPMENT MECHANISM (CDM) UNDER CD4CDM INITIATIVE Date: 8-9 April, 2008 Venue: LGED Bhaban, Dhaka PowerPoint PPT Presentation


  • 46 Views
  • Uploaded on
  • Presentation posted in: General

Presented by A. H. Md. Maqsood Sinha Waste Concern. Introduction to CDM Opportunities in Bangladesh. FIRST CAPACITY BUILDING WORKSHOP ON CLEAN DEVELOPMENT MECHANISM (CDM) UNDER CD4CDM INITIATIVE Date: 8-9 April, 2008 Venue: LGED Bhaban, Dhaka. web: www.wasteconcern.org. Presentation Outline.

Download Presentation

FIRST CAPACITY BUILDING WORKSHOP ON CLEAN DEVELOPMENT MECHANISM (CDM) UNDER CD4CDM INITIATIVE Date: 8-9 April, 2008 Venue: LGED Bhaban, Dhaka

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Slide1 l.jpg

Presented byA. H. Md. Maqsood Sinha Waste Concern

Introduction to CDM Opportunities in Bangladesh

FIRST CAPACITY BUILDING WORKSHOP ON CLEAN DEVELOPMENT MECHANISM (CDM) UNDER CD4CDM INITIATIVE

Date: 8-9 April, 2008

Venue: LGED Bhaban, Dhaka

web: www.wasteconcern.org


Slide2 l.jpg

Presentation Outline

  • What is CDM and How It works?

  • Global Market Size of CDM

  • Potential Sectors for CDM in Bangladesh?

  • Way Forward to Promote CDM

web: www.wasteconcern.org


Slide3 l.jpg

MITIGATION

ADAPTATION

Mitigation involves attempts to slow the process of global climate change by lowering the level of green house gases in the atmosphere

Adaptation involves developing ways to protect people and places by reducing their vulnerability to climate impacts.

Human Response to Climate Change

web: www.wasteconcern.org


Slide4 l.jpg

WHAT IS CDM?

  • Clean Development Mechanism (CDM) is an important component of the Kyoto Protocol (Article 12)

  • Clean Development Mechanism known as CDM. Which allows 39 industrialized countries to achieve part of their Green House Gas (GHG) emission reduction target through investment in projects in developing countries that reduce GHG emission from the atmosphere.

web: www.wasteconcern.org


Slide5 l.jpg

Project based carbon trading (CER/VER) between industrialized and developing countries

Investment $$

Industrialized country

Emission reduction credits (cer/ver)

Project Reducing GHG emissions in developing country

web: www.wasteconcern.org


Slide6 l.jpg

How Does CDM Works?

  • CDM allows developing country entrepreneurs and others to get investment fund for doing projects, which reduce Green House Gas.

  • Two things are important in CDM, namely,

  • The project proponent from developing country must prove that the GHG reduction would not have occurred in the absence of the project

  • The project must promote sustainable development

web: www.wasteconcern.org


Global carbon market at a glance 2005 2007 and projected 2008 l.jpg

100

92

90

80

70

60

60

50

Total Market

40

CDM Market

30.098

22

30

17

20

10.864

5.257

2.638

10

0

2005

2006

2007

2008

Global Carbon Market at a Glance 2005-2007 and Projected 2008

Billion US $


Slide8 l.jpg

Potential CDM projects in Different Sectors


Slide9 l.jpg

Potential Sectors for CDM Project in Bangladesh

Waste

Energy


Slide10 l.jpg

SUMMARY OF THE CURRENT CDM PROJECT PORTFOLIO


Slide11 l.jpg

Investment Opportunity from CDM

maximum

minimum


Slide12 l.jpg

Current Issues with CDM in Bangladesh

  • Low level of awareness and capacity amongst the public, private and financial sectors about CDM opportunities.

  • Several time consuming permissions/clearance required to implement CDM projects in Bangladesh.

  • Lack of financial and technological re sources to implement CDM projects.

  • Transaction cost is high specially for small projects.

  • Lack of enough baseline data.

  • Many energy and waste sector based CDM projects require bundling approach. Identification of right institution for bundling of the projects is in some instances is a big barrier to implement the projects.


Slide13 l.jpg

Way Forward

  • We need to simplify this lengthy process/barrier.

  • We need to enhance the capacity of the staffs and officials of public and private sector about CDM projects.

  • Many projects such as composting, biogas, improved stove, forestry can be implemented having pro-poor elements.

  • We need to identify these kind of projects which has both the adaptation and mitigation benefits.

  • One stop approval process for CDM projects should be introduced (CDM/BOI/ Bangladesh Bank/Line Ministry) to encourage CDM investment.

  • There are many investors keen to invest in projects which has both mitigation and adaptation benefits.


Slide14 l.jpg

THANK YOU


  • Login