  • 97 Views
  • Uploaded on
  • Presentation posted in: General

OPERATION AND MAINTANENCE. EMS / SCADA System Installed under SR-ULDC scheme at SRLDC. EMS / SCADA System. Contractor – M/s. GE-Harris Contract Value – Rs 148 Crores Commissioned – Jan 2002 Under commercial operation – 1 st July 2002 Under warranty upto 30-06-2004

Download Presentation

OPERATION AND MAINTANENCE

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Operation and maintanence

OPERATION AND MAINTANENCE

EMS / SCADA System Installed under SR-ULDC scheme at SRLDC


Ems scada system

EMS / SCADA System

  • Contractor – M/s. GE-Harris

  • Contract Value – Rs 148 Crores

  • Commissioned – Jan 2002

  • Under commercial operation – 1st July 2002

  • Under warranty upto 30-06-2004

  • Under paid warranty from 01-07-04 to 30-06-05

  • Under extended paid warranty from 01-07-05 to 30-06-06

  • Contract price of maintenance (during paid warranty)

    - $ 8,28,716 [ Volume I of on-shore services]

    - Rs 1,94,50,000

    Total Rs 5,67,42,220/- (considering 1$ = Rs 45)


Present maintenance support under extended paid warranty from geh

Present Maintenance support under Extended Paid Warranty from GEH

  • Non-Comprehensive

  • Available spares being used for replacement.

  • Specific time-frame to attend problem is not defined.

  • No deduction for delay in attending reported problem.

  • More than 50 Field Problem Reports (FPRs) pending as on date.


Why maintenance contract required beyond 01 07 2006

WHY MAINTENANCE CONTRACT REQUIRED BEYOND 01-07-2006 ?

  • CRITICALITY OF DATA

    • ULDC DATA NOW HAS COMMERCIAL IMPACT POST ABT – HENCE HIGH UPTIMES ARE A MUST

    • ONLY 27 OF THE 215 RTUs REPORT TO RSCC – REST ARE REPORTING TO SEBs – HENCE SEBs/TRANSCO NEED TO BE A PART OF THE AMC

    • STATE ESTIMATOR AND RTNA RESULTS WOULD BE DEPENDABLE ONLY IF DATA AVAILABILITY IS HIGH

  • OBSOLESCENCE

    • OPERATING SYSTEM (AIX 4.3.2), DATABASE (SYBASE 11.9.2),RAID BOX (MTI) :- MODELS/VERSIONS ARE OBSOLETE OR HAVE REACHED END-OF-LIFE/SUPPORT

    • ICCP ENGINE (ONE), HUB (CABLETRON) :- COMPANIES ARE NOT EXISTING TODAY OR HAVE BEEN TAKEN OVER

  • GROWING SYSTEM NEEDS

    • ADDITION OF NEW DATA TYPES

    • INTEGRATION WITH NEW IEDs

    • CUSTOMISATION OF MODULES TO ADAPT TO REQUIREMENTS

    • OTHER REQUIREMENTS (LIKE DATA EXTRACTION FOR MoP)

  • UNPRECEDENTED EVENTS

    • DATABASE CORRUPTION

    • FAILURE OF CRITICAL MODULES

    • ENTIRE XA SYSTEM CRASH


Options before us

OPTIONS BEFORE US

  • GO WITH M/S GE FOR A COMPREHENSIVE MAINTENANCE SUPPORT.

    • ISSUES

      • M/S GE IS QUOTING VERY HIGH :- Rs 10.4 CR/YEAR!

      • NO PENALTY FOR NON AVAILABILITY.

      • HARDWARE TO BE PROVIDED BY CUSTOMER.

    • DETAILED SPECIFICATIONS AND QUOTE SHEET PREPARED BY SRLDC AND SENT TO M/S GE – THEY ARE YET TO QUOTE FOR THE SAME.

  • EXPLORE ALTERNATIVES WITH NELCO / HONEYWELL :- M/S GE’S INDIA CONTRACTORS FOR XA

    • ADVANTAGES

      • AMC WOULD BE COST EFFECTIVE

      • EXPERTISE AND MANPOWER AVAILABLE WITH BOTH PARTIES

      • OUR SPECIFICATIONS CAN BE IMPOSED

      • SOME PROPRIETARY SPARES WOULD STILL BE REQUIRED FROM GE

      • POSSIBILITY OF BACK TO BACK SUPPORT AGREEMENT WITH GE FOR SPECIALISED SERVICES MAY BE EXPLORED

    • DIS-ADVANTAGES

      • CUSTOMISATION AND SOURCE CODE CHANGES MAY NOT BE POSSIBLE

      • EXISTING BUGS WOULD STILL BE THERE


Options before us1

OPTIONS BEFORE US

  • EXPLORE THE POSSIBILITIES WITH A THIRD PARTY LIKE CDAC

  • PRESENT STATUS

    • NELCO AND HONEYWELL APPROACHED AND EXPLORATORY DISCUSSIONS WERE HELD

    • BOTH PARTIES EXPRESSED WILLINGNESS FOR TAKING UP ENTIRE SCOPE OF WORK

    • CDAC WAS ALSO APPROACHED AND ARE DOING A PRELIMINARY FEASIBILITY STUDY