An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 24th Street Improvements Project CEQA Public Hearing for Certification of Final Environmental Impact Report January 16, 2014

  2. What’s Happened So Far: Notice of Preparation Circulated April 11, 2008 to May 12, 2008 Public Scoping Meeting held April 30, 2008 Draft Environmental Document Circulated from May 23, 2012 to July 16, 2012 Caltrans Public Hearing (NEPA) held June 26, 2012 Planning Commission Public Hearing (CEQA) held July 5, 2012.

  3. 24thStreet Improvements Proposed Cul-de-sacs – Not a part of this Project CC Resolution 128-12 approved November 2012 Allowed with Conditions

  4. Notification/Mailing Area

  5. 24th Street Improvements Project State Freeway System in Metropolitan Bakersfield

  6. 24th Street Improvements Project Projects to improve the SR 58/SR 178 Corridor SR-178 at Morning Drive ROSEDALE HIGHWAY SR-178 (WIDEN) SR-178 AT FAIRFAX RD

  7. 24th Street Improvements Project TRIP projects on SR 58/SR 178 Corridor SR-178 at Morning Drive ROSEDALE HIGHWAY SR-178 (WIDEN) SR-178 AT FAIRFAX RD 24THSTREET IMPROVEMENT PROJECT

  8. From 1971 Caltrans Study of Freeway Alignments

  9. Additional Studies: ROUTE 178 CORRIDOR STUDY Prepared For: KERN COG, CALTRANS, CITY OF BAKERSFIELD Prepared By: Barton-Aschman Associates, Inc. December 1986

  10. 24th Street Improvements Project Changes from Draft Environmental Document: Enhanced Landscaping for Median and Parkway Areas Eliminated B Street access to 24th , install cul-de-sac Installed raised/striped median for NB Oak Right-Turn Eliminated two proposed bus turnouts between Cedar and A Streets Eliminated WB Left-turns at Beech, Spruce and Cedar Streets Eliminated EB Left-turns at Spruce and Cedar Streets Shifted Elm Street cul-de-sac north

  11. 24th Street Improvements Project Alternative No. 1 – Widen to the North Selected as Preferred Alternative Based on: Public Comments and Concerns Received (over 1700) Results of Engineering and Environmental Technical Studies Superior Engineering Design (Less Driveways) More efficient Traffic Movement Smaller relative impact to Potential Historic Districts Fewer Full Parcel Acquisitions from the two Districts Larger District to North, so less percentage impact to District Smaller lots on north result in smaller residual property remainders after project Cost is slightly less

  12. 24th Street Improvements Project Alternative No. 1 – Widen to the North Selected as Preferred Alternative

  13. 24th Street Improvements Project Alternative No. 1 – Widen to the North Selected as Preferred Alternative

  14. 24th Street Improvements Project Alternative No. 1 – Widen to the North Selected as Preferred Alternative

  15. 24th Street Improvements Project Alternative No. 1 – Widen to the North Selected as Preferred Alternative

  16. 24th Street Improvements Project Two Potential Historic Districts For This Project Only

  17. Thank You Landscaping Concept Roland Genick