Slovak University of Technology Faculty of Material Science and Technology in Trnava. CIM. Introduction to CIM. Methodology for discrete-event simulation software selection. Realization in two phases The first phase

Download Presentation

CIM

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Slovak University of Technology Faculty of Material Science and Technology in Trnava CIM Introduction to CIM

  2. Methodology for discrete-event simulation software selection • Realization in two phases • The first phase • Reduce selection to max. 10 products on the base of important criterion (K.O.) (red in tables) • The second phase • Detail evaluation of software packages on the base of the next weighted criterion

  3. What does it mean CIM ? • Computer integrated manufacturing • Uniform definition does not exist! • Generally valid solution does not exist!

  4. CIM • New philosophy of enterprise management. • The goal is the implementation of information technologies to all enterprise activities: • Increasing of labour productivity • Decreasing material and energy costs • Reduction of flow time • Increasing of capacity utilisation • Increasing of production quality

  5. CIM is characterised: • Application independent database • Consistent chain of business processes • Short feedback • fast reacion on system changes

  6. CIM • Usually CIM is understood as philosophy than tool in spite of CIM covers a lot of methods and tools. • CIM philosophy arose as answer to rapid development industry and computer technologies. • CIM does not represent only one software homogenous system, but more different software and interfaces for integration already installed systems.

  7. Integration in CIM • The integration is key element of CIM • We discriminate • vertical integration – different function • horizontal integration – parts the same function

  8. CIM • CIM (Computer Integrated Manufacturing) is understood as a model for continuous support of production and development by information technologies.

  9. CIM - integration • Pod základným princípom integrácie rozumieme spojenie všetkých pracovných miest a strojov navzájom ako aj ich spojenie s plánovacími, dispozičnými, riadiacimi systémami, ktoré sú prepojené navzájom. Tieto spojenia sú zabezpečené administratívnymi, štruktúrnymi a technickými opatreniami. • Data integration is the second relevant attribute of CIM.

  10. Integrated information architecture • The big companies ORACLE, SAP etc. Promote the idea of building the integrated information architecture. Its basic features are: • Building of integrated data model • Design of robust and flexible applications which are designed for complex integration of business processes • Usage of flexible and open standards for integration realization • Modular implementation which respects business processes

  11. Integrated support of business processes Analyses Suppliers Service Invoice Planning Database Sale Marketing Orders Sale Contracts Configuration

  12. CIE • CIM CIE • CIE Computer Integrated Enterprise • CIE = CIM + CAO ? • CAO Computer Aided Office

  13. CHIMComputer-Human Integrated Manufacturing • The reasons of man integration into new production structures: • A lot of activities is not possible to technically cover • Only human know to evaluate many situations • A lot of decision processes are too difficult for automation • Today approaches to flexible productions is looking for synergic effect in relationship integration human and computer

  14. Doubts about CIM • The main weakness of CIM building are administrative • absence of longtime information strategy • Not filfilled expectations Underestimating of human factor • Incompatibility of software and hardware • Dilemma in usage of information systems

  15. Dilemma in usage of information systems • Recording a lot of information • Deficit of information • Communication without paper • Big usage of paper („stack of paper“) • software and hardware price decreasing • High cost for operation and maintenance

  16. Not fulfilled expectations • Isolated subsystems without required interconnection • Management also workers have not needed knowledge for new philosophy • The approaches to CIM building were too technical and concentrated on productivity only • The achievement of total automation (without human) is impossible

  17. Information technologies • The term represents all technology which cover with information processing. • It means mainly organization, computer and telecommunication equipment but also software and its organization.

  18. Computer science • Computer scienceis science about systematic information processing, especially about automated information processing by computers • Computer Science - Informatics

  19. Development trends of production and new requests on information technologies

  20. Development trends of production and new requests on information technologies