1 / 27

Barry Cable Director Transport and Tourism Division

1 st Expert Group Meeting on Developing Euro-Asian Transport Linkages 9-11 March 2004, Alamaty Kazakhstan Strategy for Further Development of Euro-Asian Transport Linkages. Barry Cable Director Transport and Tourism Division. Background to “Developing Euro-Asian Transport Linkages”.

mona-joyner
Download Presentation

Barry Cable Director Transport and Tourism Division

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 1st Expert Group Meeting on Developing Euro-Asian Transport Linkages 9-11 March 2004, Alamaty Kazakhstan Strategy for Further Development of Euro-Asian Transport Linkages Barry CableDirectorTransport and Tourism Division

  2. Background to “Developing Euro-Asian Transport Linkages” • Developing countries constrained by inadequate transport infrastructure, legislation that differs from one country to another and time-consuming border procedures • Opportunities for interregional transport not fully explored • Five regional Commissions • “Capacity-building in developing interregional land and land-cum-sea transport linkages” (2002-2006).

  3. Expected accomplishments • To identify important existing and potential interregional transport linkages • To strengthen the capacities of national officials • To put in operation efficient interregional transport linkages.

  4. Strategic Vision for Euro-Asian Transport Links • 2000, UNECE and UNESCAP put forward their “Common ECE/ESCAP Strategic Vision for Euro-Asian Transport Links” at the Second International Euro-Asian Conference on Transport • 2001, with modification adopted by the UNECE Inland Transport Committee • 2003, Third International Euro-Asian Conference on Transport endorses the vision as eventually “integrated and harmoniously functioning Euro-Asian transport system” • Euro-Asian Corridors identified

  5. Major Euro-Asian Corridors identified Transsiberian: Europe (PETCs 2, 3 and 9) – Russian Federation Japan, with branches to: • Kazakhstan – China and Korean peninsula; • Mongolia – China. TRACECA: Eastern Europe (PETCs 4, 7, 8, 9) – across Black Sea – Caucasus – across Caspian Sea – Central Asia. Southern: South-eastern Europe (PETC 4) – Turkey – Islamic Republic of Iran, with branches from Iran to: • Central Asia – China; • South Asia – South-East Asia/Southern China. North-South: North Europe (PETC 9) – Russian Federation, with branches to: • Caucasus – Persian Gulf; • Central Asia – Persian Gulf; • Across the Caspian Sea – Islamic Republic of Iran – Persian Gulf.

  6. Strategy for the Euro-Asian transport system development • Formulation of integrated intermodal international Euro-Asian transport routes/corridors and networks. • Formalization through international agreements or amendments to existing ones, as a basis for their coordinated development. • Facilitation of transport at border-crossing based on relevant international conventions • Establishing national transport/trade facilitation committees • Analysis of routes/corridors to identify physical and non-physical barriers • Operationalization through efficient arrangements and mechanisms for each international route

  7. Strategy for the Euro-Asian transport system development • Introduction/development of modern information technology. • Development of transport logistics. • Development of Public-Private Partnerships • Further development of efficient cooperation between international and other organizations involved. • Particular attention to be given to needs of landlocked countries and economies in transition.

  8. Major outputs of the project Infrastructure • Routes (rail, road, intermodal) within each of the Euro-Asian Transport corridors identified • Set of alternative transport routes (where appropriate) for each participating country identified; • Agreements on the routes reached between the countries concerned.

  9. Major outputs of the project Facilitation/Border crossing • National Trade and Transport Facilitation Committees established/ strengthened in the countries (TOR, Work Plans, Protocols…); • Actions initiated/persued to introduce and implement major relevant international conventions (UNECE, UNESCAP resolution 48/11...); • Border-crossing points and route specific problems identified

  10. Major outputs of the project Development needs identified • Major physical and non-physical barriers identified through the UNESCAP methodology for international transport route analysis, including costs and time issues; • Possibility of transport of ISO and non-ISO (high cube) containers along each of Euro-Asian transport routes established (including container terminals, ICO, transshipment points/nodes); • Priority development needs (needs of common domestic and international importance) identified; • Possible Public-Private Partnerships (PPP) approaches suggested; • Operation cooperative arrangements suggested;

  11. Formulation of interregional transport linkages UNECE-UNESCAP-National Focal Points • Extension of Pan-European Transport Corridors (PETCs) towards Asia • Extension of Asian transport routes to Europe • Euro-Asian Transport corridors, a starting point along with • UNECE European Agreement on Main International Traffic Arteries (AGR) and UNESCAP Asian Highway • UNECE European Agreement on Main International Railway Lines (AGC) and UNESCAP Trans-Asian Railway as the basis for the route alignments. • TRACECA-ECO-OSJD Euro-Asian links also considered

  12. Limitations to identification of linkages • Not all links in these networks included in but only those most relevant within the four corridors. • Countries are invited to propose routes considered Euro-Asian importance. • Intermodal perspective, inland water routes and major seaports should also be considered together with inland container depots and border crossing facilities • Focus on container traffic. • At least three major origin/destination points in Europe (Central, Northern and Southern Europe) should be identified and agreed upon as basis for analysis. • Air transport be excluded at the present time.

  13. Considerations in identifying linkages • Corridor “Transsiberian” • Only railway routes to be considered ? • Corridor “TRACECA” • Railway-cum-sea (across the Caspian and Black Seas) route only ?; • Corridor “Southern” • Rail, road and intermodal (rail-cum-road) routes; • Routes through South Asia and South-East Asia to China to be considered in follow-up phase of project. • Corridor “North-South” • Railway and rail-cum-sea (Caspian Sea) route; • Clarification should be sought with regard to roads.

  14. Project schedule - 2004 • Identification of routes (March – July 2004) • technical specifications of the infrastructure; • operational information, including estimated traffic volume; and • Current/ongoing investment projects on routes • UNECE and UNESCAP have prepared a draft questionnaire for consideration • As far as possible, the secretariat will provide the NFPs with data available to assist • Consolidation/analysis of data (July – Sept 2004) • Presentation of preliminary results (October 2004)

  15. Prioritization of investment projects • Countries develop inventory of national projects • UNECE/UNESCAP consolidate at interregional level • Prioritization • Consensus on linkages/route alignments • Constitute elements of the corridors • Included in UNECE/UNESCAP networks • Do not meet minimum standards for international traffic • Identified as a time/cost bottleneck

  16. UNESCAP time-cost methodology to isolate, identify bottlenecks Time/cost Distance

  17. UNESCAP time-cost methodology to isolate, identify bottlenecks Time/ cost Transport to border Distance

  18. UNESCAP time-cost methodology to isolate, identify bottlenecks Time/ cost Border crossing Distance

  19. UNESCAP time-cost methodology to isolate, identify bottlenecks Transport to sea port Time/ cost Distance

  20. UNESCAP time-cost methodology to isolate, identify bottlenecks Wait at sea port Time/ cost Distance

  21. UNESCAP time-cost methodology to isolate, identify bottlenecks Sea transport Time/ cost Distance

  22. UNESCAP time-cost methodology to isolate, identify bottlenecks Time/ cost Distance

  23. Comparison of border crossing time (hours) 300 250 200 Border 150 100 50 0 Lao-Thai Lao- Mongolia- Mongolia- Uzbekistan- Nepal- India Kazakhstan- Vietnam China Russia Russia Turkmenistan Average Maximum

  24. Comparison of border crossing costs (US$ per TEU) Cost/TEU $650 $700 $600 $500 $400 $293 $300 $200 $155 $131 $124 $200 $100 $100 $0 Mongolia- Nepal- India *Uzbekistan- Lao-Thai Lao- Mongolia- *Kazakhstan- Vietnam Turkmenistan China Russia Russia

  25. Project schedule - 2005 • Facilitation of transport along the Euro-Asian transport linkages (2005) • Analysis of transit times and costs along routes • cost/time/distance analysis be conducted to assess the physical and non-physical bottlenecks • Capacity building and strengthening of implementation of the major international transport agreements and conventions by countries • series of national (and/or subregional) workshops • Strengthening of national trade/transport facilitation committees

  26. Project schedule - 2006 • Establishment of a database with contact details of responsible experts and institutions involved in the Euro-Asian development aspects in consultation with member states, other development agencies and offices of the UN system. • Creation of a website for the project (already initiated). • Organization of workshop for sharing lessons learned across the Regional Commissions.

  27. Thank you for your attention