Mechanical structure of svd
This presentation is the property of its rightful owner.
Sponsored Links
1 / 15

Mechanical structure of SVD PowerPoint PPT Presentation


  • 81 Views
  • Uploaded on
  • Presentation posted in: General

Mechanical structure of SVD. Y.Yamada(KEK) at BELLE meeting on June 26 ’98. 1. Introduction 2. Prototype 3. Status and schedule. 1. Introduction. The SVD consists of three layers of DSSD ladders , forward and backward end rings made of Aluminum,

Download Presentation

Mechanical structure of SVD

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Mechanical structure of svd

Mechanical structure of SVD

Y.Yamada(KEK) at BELLE meeting on June 26 ’98

1. Introduction

2. Prototype

3. Status and schedule


1 introduction

1. Introduction

  • The SVD consists of

    • three layers of DSSD ladders,

    • forward and backward end rings made of Aluminum,

    • outer cover which consists of two half cylinders made of 0.5mm-t CFRP,

    • forward and backward support cylinders made of 2.5mm-t CFRP.

  • Supporting system

    • Heat sink of DSSD ladders are mounted on the end rings,

    • forward and backward end rings are connected by the outer cover, and they are supported by the support cylinders,

    • The support cylinders are supported by the end plates of CDC.


Mechanical structure of svd

  • Precision of machining is better than 20 microns.

  • FEM analysis predicts gravitational sag to be about 30 microns.


Mechanical structure of svd

2. Prototype

We made prototypes of the ladders, end rings,

outer covers, support cylinders and beam pipe.


Mechanical structure of svd

Prototype ladders, end rings and outer covers.

Prototype outer covers made by 0.5mmt CFRP.


Mechanical structure of svd

Prototype end ring

Forward backward end rings

were machined on NC better

than 10 microns.

Water tubes glued on the end

rings. dT<2 degree C.


Mechanical structure of svd

How to fix ladder

Al-N heat sink, heat pipes, spring and 5mm pin for backward.

Heat sinks fixed on the backward end ring by spring and pin.


Mechanical structure of svd

Sliding mechanism

Al-N heat sink, heat pipes, spring and 3mm pin for forward.

Heat sinks fixed on the forward end ring by spring and pin.


Mechanical structure of svd

How thermal bowing can be avoided by sliding

If we fix the ladder with sliding mechanism at forward side and push the ladder from backward side, sliding occurs around D=20 microns(or dT=10deg or f=7kgf).

The bowing of ladder is 10 microns at maximum with the ribs of BN (1mm thick and 7mm high).

We use weaker BN (0.5mm thick and 6.25mm high) and weaker spring than this test.

The bowing will be 15 microns at maximum

and small enough.


Mechanical structure of svd

Prototype support cylinder

Prototype support system on CDC.


Mechanical structure of svd

Assembly bench by which the shape of structure and ladders

can be measured with an accuracy better than 10 microns.


Mechanical structure of svd

  • Clam shell scheme

    • ladders, end rings and outer cover can be divided into two (left and right) halves.

The tool which divides the structure into two clam shells.


Mechanical structure of svd

3. Status and schedule

Real structures are under machining.

Real end ring under machining.

CFRP(E=160GPa) for real outer cover.


Mechanical structure of svd

Machining schedule(June and July).

All components of the structure will be ready by end of July.


Mechanical structure of svd

Assembly Plan(Aug. ~ Oct.).

  • Plan

    • Ladder mounting will start early Aug. and will end late Aug.

    • Total assembly will be done early Sep.

    • SVD will be moved to Tsukuba hall and system test will start mid Sep.

    • SVD will be ready to install mid Oct.