Goes rrr awg critical path milestones
Download
Sponsored Links
This presentation is the property of its rightful owner.
1 / 1

GOES-RRR/AWG ‘Critical Path’ Milestones PowerPoint PPT Presentation


  • 82 Views
  • Uploaded on
  • Presentation posted in: General

GOES-RRR/AWG ‘Critical Path’ Milestones. FY09 Complete study of ABI-like AMVs using SEVERI data (heritage channels). - Continue comparison/validation studies of simulated GOES-R AMVs produced by GEOCAT (GOES-R) and WINDCO (existing) - Add Visible and SWIR channel(s)

Download Presentation

GOES-RRR/AWG ‘Critical Path’ Milestones

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Goes rrr awg critical path milestones

GOES-RRR/AWG ‘Critical Path’ Milestones

  • FY09

    • Complete study of ABI-like AMVs using SEVERI data (heritage channels).

      - Continue comparison/validation studies of simulated GOES-R AMVs produced by GEOCAT (GOES-R) and WINDCO (existing)

      - Add Visible and SWIR channel(s)

    • Complete GRAFIIR studies to document the sensitivity of various noise effects on AMVs

    • Initial demo of potential AMVs from non-heritage spectral bands

      - ABI Channels 9-13 (WV, Ozone, IR)

    • Update ATBD with new science results


  • Login