Project No. 36703 / Spec No. WW06-01. 5-11-09: Excavation for construction of Pump Station. 6-16-09: Rebar construction at Oxidation Structure. 7-7-09: Concrete Placement for Walls at Oxidation Structure. 7-16-09: Rebar construction at the North Clarifier.
E N D
8-20-09: Construction of the Oxidation Structure, Clarifiers and Aerobic Digester
8-27-09: Construction of the Clarifiers & Oxidation Structure
9-11-09: Electrical construction for the Control and Operations Bldg
9-14-09: Concrete placement over the Electrical Conduits at the Control and Operations Bldg