ps sps days 18th january 2006
Download
Skip this Video
Download Presentation
PS - SPS days 18th January 2006

Loading in 2 Seconds...

play fullscreen
1 / 11

PS - SPS days 18th January 2006 - PowerPoint PPT Presentation


  • 83 Views
  • Uploaded on

PS - SPS days 18th January 2006. SPS Activities & Hardware Commissioning. Table of content. Short summary main activities 2005 Planning review : Remaining site activities Hardware tests Start up organisation SPS team Some pictures Final words…. Completed activities 2005. Magnets

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about ' PS - SPS days 18th January 2006 ' - mizell


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
ps sps days 18th january 2006

PS - SPS days18th January 2006

SPS Activities

&

Hardware Commissioning

Nicolas GILBERT (AB-ABP)

table of content
Table of content
  • Short summary main activities 2005
  • Planning review :
    • Remaining site activities
    • Hardware tests
  • Start up organisation SPS team
  • Some pictures
  • Final words…

Nicolas GILBERT (AB-ABP)

completed activities 2005
Completed activities 2005
  • Magnets
    • Replacement quadrupole jacks (ring magnets)
  • Beam transfer
    • LSS4 : replacement MSE protection element (TPSG4 beam diluter)
    • LSS6 : major upgrade extraction channel (fast extraction to LHC), including new septa protection (TPSG6) and 4 MKEs
    • New bumper configuration in LSS6
    • New transfer line configuration for TI2 (+ old T1 removed)
  • Beam instrumentation (mainly SPS points 4, 5 and 6)
    • New BIPMH in LSS5
    • Instrumentation moves (BSHV, BPSM, BRCV, …)
    • Removal all BI monitors in TT60 (obsolete slow extraction to West Area)

Nicolas GILBERT (AB-ABP)

completed activities 20051
Completed activities 2005
  • RF : Upgrade of SPS damper in LSS2
  • Experiment :Removal of the 2 Roman Pots in LSS5(LHC experiment TOTEM)
  • Civil Engineering : Vault repair in LSS3(lots of contributions !)
  • Support
    • AT/VAC : frequent interventions (beam line configurations, access, removal TAL 11431, …)
    • SC/RP : control during access to tunnel
    • TS/SU : general check alignments, altimetry, …
    • TS/CV : various interventions on cooling networks & ventilation ducts
    • TS/EL : change of irradiated cables in LSS6, as well as in TDC2 including removal of PVC cables
    • TS/IC – HM : involved in all transport issues

Nicolas GILBERT (AB-ABP)

sps planning

patrols

SPS planning

Nicolas GILBERT (AB-ABP)

start up organisation
Start up organisation
  • Weekly SPS coordination meetings from January
  • Short daily coordination meeting once SPS access restricted (from feb.) with directly concerned people
  • Regular SPS planning update, available under Web/EDMS
  • Major update of SPS drawings (more than 250 updated layout drawings up to now by TS/MME) available soon in CDD

Nicolas GILBERT (AB-ABP)

some pictures
Some pictures …
  • TIDVG : upgraded version to be installed in LSS1

Nicolas GILBERT (AB-ABP)

some pictures1
Some pictures …
  • The Roman Pot set- up during test beam in the SPS in summer 2004
  • Now removed from ECX5

Nicolas GILBERT (AB-ABP)

some pictures2
Some pictures …

TPSG4

TPSG6/MST

(July 2005)

  • SPS Extraction line

TPSG6/MST

(Jan 2006)

Nicolas GILBERT (AB-ABP)

some pictures3
Some pictures …
  • MOPOS consolidation : Passive RC component in original adapter replaced by PCB
  • About 250 adaptors (=125 MOPOS) to be replaced early 2006

Nicolas GILBERT (AB-ABP)

final words
Final words…
  • Useful info :
    • BT & BI contribution to SLI project see EDMS 624554
    • MOPOS activities see EDMS 679896
    • LSS3 vault repair see EDMS 675246
    • SPS detailed planning see EDMS 476624
  • Specials Thanks to :
    • Alan Spinks (SPS technical coordination)
    • Jose Monteiro (SPS planning)
    • SPS team (AB & AT divisions)

Nicolas GILBERT (AB-ABP)