PS - SPS days 18th January 2006. SPS Activities & Hardware Commissioning. Table of content. Short summary main activities 2005 Planning review : Remaining site activities Hardware tests Start up organisation SPS team Some pictures Final words…. Completed activities 2005. Magnets

Download Presentation

PS - SPS days 18th January 2006

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Ps sps days 18th january 2006

PS - SPS days18th January 2006

SPS Activities

&

Hardware Commissioning

Nicolas GILBERT (AB-ABP)


Table of content

Table of content

  • Short summary main activities 2005

  • Planning review :

    • Remaining site activities

    • Hardware tests

  • Start up organisation SPS team

  • Some pictures

  • Final words…

Nicolas GILBERT (AB-ABP)


Completed activities 2005

Completed activities 2005

  • Magnets

    • Replacement quadrupole jacks (ring magnets)

  • Beam transfer

    • LSS4 : replacement MSE protection element (TPSG4 beam diluter)

    • LSS6 : major upgrade extraction channel (fast extraction to LHC), including new septa protection (TPSG6) and 4 MKEs

    • New bumper configuration in LSS6

    • New transfer line configuration for TI2 (+ old T1 removed)

  • Beam instrumentation (mainly SPS points 4, 5 and 6)

    • New BIPMH in LSS5

    • Instrumentation moves (BSHV, BPSM, BRCV, …)

    • Removal all BI monitors in TT60 (obsolete slow extraction to West Area)

Nicolas GILBERT (AB-ABP)


Completed activities 20051

Completed activities 2005

  • RF : Upgrade of SPS damper in LSS2

  • Experiment :Removal of the 2 Roman Pots in LSS5(LHC experiment TOTEM)

  • Civil Engineering : Vault repair in LSS3(lots of contributions !)

  • Support

    • AT/VAC : frequent interventions (beam line configurations, access, removal TAL 11431, …)

    • SC/RP : control during access to tunnel

    • TS/SU : general check alignments, altimetry, …

    • TS/CV: various interventions on cooling networks & ventilation ducts

    • TS/EL: change of irradiated cables in LSS6, as well as in TDC2 including removal of PVC cables

    • TS/IC – HM: involved in all transport issues

Nicolas GILBERT (AB-ABP)


Sps planning

patrols

SPS planning

Nicolas GILBERT (AB-ABP)


Start up organisation

Start up organisation

  • Weekly SPS coordination meetings from January

  • Short daily coordination meeting once SPS access restricted (from feb.) with directly concerned people

  • Regular SPS planning update, available under Web/EDMS

  • Major update of SPS drawings (more than 250 updated layout drawings up to now by TS/MME) available soon in CDD

Nicolas GILBERT (AB-ABP)


Some pictures

Some pictures …

  • TIDVG : upgraded version to be installed in LSS1

Nicolas GILBERT (AB-ABP)


Some pictures1

Some pictures …

  • The Roman Pot set- up during test beam in the SPS in summer 2004

  • Now removed from ECX5

Nicolas GILBERT (AB-ABP)


Some pictures2

Some pictures …

TPSG4

TPSG6/MST

(July 2005)

  • SPS Extraction line

TPSG6/MST

(Jan 2006)

Nicolas GILBERT (AB-ABP)


Some pictures3

Some pictures …

  • MOPOS consolidation : Passive RC component in original adapter replaced by PCB

  • About 250 adaptors (=125 MOPOS) to be replaced early 2006

Nicolas GILBERT (AB-ABP)


Final words

Final words…

  • Useful info :

    • BT & BI contribution to SLI project see EDMS 624554

    • MOPOS activities see EDMS 679896

    • LSS3 vault repair see EDMS 675246

    • SPS detailed planning see EDMS 476624

  • Specials Thanks to :

    • Alan Spinks (SPS technical coordination)

    • Jose Monteiro (SPS planning)

    • SPS team (AB & AT divisions)

Nicolas GILBERT (AB-ABP)