slide1
Download
Skip this Video
Download Presentation
Vehicle Factory, Jabalpur

Loading in 2 Seconds...

play fullscreen
1 / 56

Vehicle Factory, Jabalpur - PowerPoint PPT Presentation


  • 366 Views
  • Uploaded on

Vehicle Factory, Jabalpur. Welcomes. ALL DIGNITARIES OF REGIONAL INVESTORS\' MEET. ON 24 th Feb’ 2013. An overview of Vehicle Factory Jabalpur. 2. ADMINISTRATIVE SET UP.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about ' Vehicle Factory, Jabalpur ' - miya


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
slide1

Vehicle Factory, Jabalpur

Welcomes

ALL DIGNITARIES OF REGIONAL INVESTORS\' MEET

ON 24th Feb’ 2013

slide2

An overview

of

Vehicle Factory

Jabalpur

2

administrative set up
ADMINISTRATIVE SET UP

VFJ is one among 41 Ordnance Factories functioning under the technical & administrative control of Ordnance Factory Board (OFB), Department of Defence Production, Ministry Of Defence.

3

slide4
VFJ IS THE SECOND LARGEST ORDNANCE FACTORY IN TERMS OF TURN-OVER (Rs. 1600 Cr.).

Production of Shaktiman 3T (TOT from MAN Germany) , Nissan 1T & Jonga (ToT with NISMO Japan) by GCF during 1959 was taken up at VFJ after Chinese aggression in 1962 to meet the large deficiency of military transport vehicles.

Total of 1,69,560 Nos of Shaktiman, Nissan & Jonga have been supplied to Army.

VFJ switched over to new generation vehicles, since 1998:

Stallion MK III ( 5/7.5 T- KPL : 5.0)

LPTA 713 ( 2.5 T- KPL : 6.5)

under TOT Agreements from AL and TML respectively from 1998.

VFJ is now making BS-III version of these vehicles from Oct’ 10 .

Genesis of B-vehicle production in OFs

Since 2008-09, VFJ has taken up production of Mine Protected Vehicles & Bullet Proof Vehicles for Army and MHA.

slide5

VFJ in Brief

  • ISO-9001 certified since 1993.
  • ISO:9002-2008 certified processes.
  • All Labs (Physical, Metallurgical & Metrology) have NABL accreditation.
slide6

ROLLING OUT THE FIRST SHAKTIMAN

6

Pandit Jawaharlal Nehru, 1st Prime Minister observing Shaktiman Chassis at the time of rolling out of first vehicle on 6th June 1959

slide7

SHAKTIMAN

NISSAN

JONGA

PRODUCTS

(Till 1998)

7

slide8

Principal Products - AT PRESENT

Stallion MK-IV BS-III

LPTA 715 BS-III

2 KL Water Bowser on LPTA

Mine Protected Vehicle

Bullet Proofing of Maruti Gypsy

Bullet Proofing of Tata 407

Bullet Proofing of LPTA 715

8

slide17

Production Facilities

  • VFJ has four modern Manufacturing Plants and a Test Track to produce Stallion & LPTA vehicles.
    • Plant – I :Fabrication of Stallion & LPTA Items and Assembly of Stallion.
    • Plant –II : Manufacture and Assy. of Transmission Aggregates.
    • Plant-III :Semi-automatic LPTA Assembly, including 2KL Water Bowser.
    • Plant- IV :Vehicle Testing, Final Preparation & Issue.
    • Test Track : Practical running of vehicle under different terrain.
  • The above plants have Modern Production Machines.
  • Our Quality Control Department is equipped with sophisticated Quality Control Equipments.
  • Modernization of these facilities is being done in a phased manner.

17

slide18

Present Manufacturing Capability

  • Core Competence
    • Machining
        • Gears, Shafts, Housings & other precision components
    • Transmission Assemblies
        • Gear Boxes & Auxiliary Gear Boxes
        • Front & Rear Axles
    • Fabrication
        • Chassis Frame & Load Body
    • Armour Fabrication
        • Plasma Cutting
        • Laser Cutting
        • Water Jet Cutting
        • Armour Welding
    • Vehicle Assembly
    • Vehicle Testing

18

slide31

Effective In-process Quality Control

  • Computerized Inspection Equipment.
  • On-line Gauging.
  • Statistical Process Control Techniques in use.
  • ISO-9001 certified since 1993.
  • ISO:9002-2008 certified processes.
  • All Labs (Physical, Metallurgical & Metrology) have NABL accreditation.
  • 3-Tier Departmental Quality Audit System

31

slide37
SOURCE DEVELOPMENT

AND

VENDOR REGISTRATION

AT VFJ

registration of firms with vfj
REGISTRATION OF FIRMS WITH VFJ

GENERAL:

  • VFJ IS REGULARLY IDENTIFYING SUITABLE SOURCES OF SUPPLY AND TO PERIODICALLY UPDATE THE VENDOR LIST AS GUIDED BY “DEFENCE PROCUREMENT MANUAL” (DPM).
  • THE DETAILED PROCEDURES FOR REGISTRATION OF FIRMS ARE FOLLOWED AS MENTIONED IN THE DPM ISSUED BY M OF D & SOP (STANDING OPERATING PROCEDURE) ISSUED BY OFB.
  • IT IS ESSENTIAL THAT THE CREDENTIALS OF THE FIRMS APPLYING FOR REGISTRATION WITH VFJ, INCLUDING THEIR FINANCIAL STATUS, THE MANUFACTURING & QUALITY CONTROL FACILITIES, THE BUSINESS ETHICS AND THEIR MARKET STANDING ARE THOROUGHLY SCRUTINISED BEFORE REGISTERING THEM AS AN APPROVED SOURCE OF SUPPLY FOR A PARTICULAR ITEM.
parts of vendor registration request form
PARTS OF ‘VENDOR REGISTRATION REQUEST FORM’
  • ADMINISTRATIVE INFORMATION
  • FINANCIAL INFORMATION
  • TECHNICAL INFORMATION
administrative information
ADMINISTRATIVE INFORMATION
  • NAME OF THE COMPANY/VENDOR
  • ADDRESS
    • REGD. OFFICE
    • WORKS/FACTORY
  • ADDRESS OF LOCAL BRANCH/BRANCH OFFICE /SOLE SELLING AGENT (IF ANY).
  • DATE OF INCORPORATION OF THE COMPANY/ COMMENCEMENT OF PRODN.
administrative information1
NATURE OF COMPANY

PROPRIETORY

PVT. LIMITED

P.S.U.

PARTNERSHIP

CATEGORY OF INDUSTRY.

DETAILS OF REGISTRATION.

NATURE OF BUSINESS.

DETAILS OF CURRENT PRODUCTS & SERVICES.

DETAILS OF TECHNICAL COLLABORATIONS.

DETAILS OF MAJOR CUSTOMERS.

ADMINISTRATIVE INFORMATION
financial information
FINANCIAL INFORMATION
  • NAME OF BANKERS & ACCOUNT NOS. & ADDRESS.
  • TAN DETAILS.
  • INCOME TAX RETURNS FOR THREE YEARS.
  • VALID LICENSE FOR PRODUCTION.
  • VALUE OF CAPITAL EMPLOYED.
  • VALUE OF CURRENT ASSETS.
  • VALUE OF CURRENT LIABILITIES.
technical information
TECHNICAL INFORMATION
  • TOTAL AREA OF FACTORY PREMISES.
  • DETAILS OF ELECTRIC POWER.
  • DETAILS OF MAN POWER EMPLOYED.
  • DETAILS OF DEFENCE STORES FOR WHICH REGISTRATION IS SOUGHT.
  • DETAIL OF IMPORTANT FACILITIES & INFRASTRUCTURE.
  • IS COMPANY ISO 9001:2008 CERTIFIED.
  • DETAILS OF R&D FACILITIES AVAILABLE.
capacity verification
CAPACITY VERIFICATION

AIM

  • VFJ IS GOING FOR OTE (OPEN TENDER ENQUIRY) FOR A PARTICULAR ITEM.
  • IF AN UNREGISTEREED FIRM CLAIMING COMPLIANCE OF TECHNICAL SPECIFICATION MEETS THE TECHNICAL SPECIFICATION REQUIREMENTS & LAID DOWN TECHNICAL PARAMETERS, BEFORE OPENING THE COMMERCIAL BID OF SUCH FIRM, THE CAPACITY VERIFICATION BY VFJ OFFICERS WOULD BE MANDATORY.
procedure for cv
PROCEDURE FOR CV

1. ON RECEIPT OF “VENDOR REGISTRATION FORM” (AVAILABLE ON OFB WEB SITE – www.ofb.nic.in), VENDOR SHOULD FILL UP ALL THE PARAMETERS. THE SAME WILL BE ASSESSED BY A INITIAL ASSESSMENT TEAM CONSTITUTED BY GM/VFJ.

2. ON OBTAINING MINIMUM MARKS (I.E. 80 OUT OF MAX 180) THE VENDOR QUALIFY FOR CAPACITY VERIFICATION. THE FIRM WILL BE PHYSICALLY VERIFIED BY A TEAM OF VFJ FOR QUALITY SURVEY AT THEIR LOCATION.

3 VENDOR QUALITY SURVEY HAS BEEN DIVIDED IN TWO PARTS AS FOLLOWS :

PART I-QUALITY SYSTEM OF VENDOR – TOTAL MARKS-100

PART II - PRODUCT SPECIFIC TECHNICAL CAPABILITY OF VENDOR – TOTAL MARKS-200

procedure for cv1
PROCEDURE FOR CV

It is mandatory that vendor has to score minimum 50% marks in both Part-I and Part- II separately to get qualified and deemed fit for registration, provided the vendor meet all other requirements as per the guidelines in this SOP.

procedure for cv2
PROCEDURE FOR CV
  • GRADING OF FIRMS WILL BE DONE AS MENTIONED BELOW BASED ON CAPACITY ASSESSMENT/QUALITY SURVEY REPORT SUVBMITTED BY CV TEAM.

TOTAL MARKS – 300 (PART I + II)

IF FIRM > 225 MARKS - GRADE-I

180 TO 224 - GRADE II

150 TO 179 - GRADE III

< 150 - FIRMS NOT CONSIDERED FOR REGISTRATION

registration certificate
Registration Certificate

AFTER QUALIFYING IN CAPACITY ASSESSMENT/QUALITY SURVEY “REGISTRATION CERTIFICATE” FOR THE PARTICULAR ITEM(S) WILL BE ISSUED BY VFJ MENTIONING THE GRADE & REGISTRATION NUMBER (VALID FOR THREE YEARS).

NOTE

AS PER THE DIRECTIVE OF OFB KOLKATA, FIRMS VENDORS “REGISTER FOR A PARTICULAR ITEM BY ANY ORDNANCE FACTORY NEED NOT APPLY FOR REGISTRATION TO OTHER ORD. FY. FOR REGISTRATION OF SAME ITEM.

assessment fee
ASSESSMENT FEE
  • LARGE & MEDIUM SCALE INDUSTRIES - RS. 5000/-
  • SMALL SCALE INDUSTRIES - RS. 2000/-
  • AUTHORISED DEALERS/SELLLING

AGENT & OTHER CATAGORIES. - RS. 2000/-

distribution of marks1
DISTRIBUTION OF MARKS

Part - I

TOTAL = 100

distribution of marks3
DISTRIBUTION OF MARKS

Part - II

TOTAL = 200

monitoring performance of suppliers vendor rating system
MONITORING PERFORMANCE OF SUPPLIERSVENDOR RATING SYSTEM
  • Quality Rating (weightage : 60 %).
  • Delivery Rating (weightage : 25 %).
  • Price Rating (weightage : 10 %).
  • Service Rating (weightage : 5%).

AND THE SHOW CONTINUE ………..

ad