HOOSIER HEARTLAND HIGHWAY. Public Information Meeting – August 27, 2009 STATE ROAD 25, SEGMENT 2 From 0.42 mile east of Tippecanoe/Carroll County line to 0.20 mile east of CR400W Length of 8.46 miles with 9 Bridges INDOT DESIGN CONSULTANT: Bernardin Lochmueller & Associates, Inc.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about ' HOOSIER HEARTLAND HIGHWAY' - mira-vang


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
hoosier heartland highway

HOOSIERHEARTLANDHIGHWAY

Public Information Meeting – August 27, 2009

STATE ROAD 25, SEGMENT 2

From 0.42 mile east of Tippecanoe/Carroll County line

to 0.20 mile east of CR400W

Length of 8.46 miles with 9 Bridges

INDOT DESIGN CONSULTANT:

Bernardin Lochmueller & Associates, Inc.

Jeff Whitaker, P.E.

section 2 central segment
Section 2: Central Segment
  • Current Design Status
    • Road & Bridge Design - 50% Complete
    • R/W Engineering – 50% Complete
section 2 central segment1
Section 2: Central Segment
  • Work Schedule
    • Hydraulic Review & Grade Review

(Completed 2007)

    • Context Sensitive Solution Design

(Completed August 28, 2008)

    • Preliminary Field Check of Road & Bridge (February 23, 2009)
    • Public Information Meeting

(August 27, 2009)

    • Design Approval (September 2009)
section 2 central segment2
Section 2: Central Segment
  • Right-of-Way Schedule
    • R/W Engineering & Acquisition (2008-2011)
    • 90 Parcels of Property
    • 26 Relocation
    • R/W Appraising

(Oct/Nov 2009-April 2010)

    • Property Information
section 2 central segment3
Section 2: Central Segment
  • Construction Schedule
    • Phase 2A - (November 2010- 2012)
    • Phase 2B – (March 2011-2013)
    • Phase 2C – (December 2011-2013)
    • Phase 2D – (October 2011-2013)
section 2 central segment4
Section 2: Central Segment
  • Alignment Issues:
    • Alignment was shifted on SR 25 and Connector Roads to avoid Environmental Sensitive Areas
    • Alignment shifted on SR 218 because of an at-grade Railroad Crossing
    • Alignment shifted on Connector Road between the New SR 218 and Existing SR 218
  • Robinson Branch Bridge Added:
    • Because of Environmental Stream Impacts & Wetland Seeps
  • Upstream Bridge Creek Bridge Added:
    • Because of hydraulics & cost savings
section 2 central segment5
Section 2: Central Segment

Main Street Access

  • Local Officials Requested – Main Street Access Revised
  • Improve Entrance into Delphi
  • Signature Bridge for the Monon Trail
section 2 central segment6
Section 2: Central Segment

Context Sensitive Solutions - Deer Creek Valley Rural Historic District

  • Committee Stakeholders
  • Total of 4 Meetings, Last Meeting August 28, 2008
  • Context Sensitive Design Solutions
    • Texturing & Coloring of the Retaining Walls & Bridge Piers
    • Shape of Bridge Piers
    • Type of Bridge Railing
    • Type of Landscaping
    • Type of Lighting at Main Street
hoosier heartland highway1

HOOSIERHEARTLANDHIGHWAY

Thank You For Coming

Questions Contact:

Aimee Kindred, Public Involvement Director

Office: (317)234-4938

Mobile: (317)517-2166

Fax: (317)233-4929

Email: [email protected]