Level 1 Muon Trigger Status. Ken Johns University of Arizona for the L1 Muon Group. L1MU Card Status. L1MU Status. Triggers A.C scintillator - 5/8 central With simple A.C roads A.B scintillator - 3/8 north A.B roads shortly A.B scintillator - 3/8 south A.B roads shortly

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about ' Level 1 Muon Trigger Status' - minya


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
Level 1 muon trigger status

Level 1 Muon Trigger Status

Ken Johns

University of Arizona

for the

L1 Muon Group



L1mu status
L1MU Status

  • Triggers

    • A.C scintillator - 5/8 central

      • With simple A.C roads

    • A.B scintillator - 3/8 north

      • A.B roads shortly

    • A.B scintillator - 3/8 south

      • A.B roads shortly

    • A.C PDT centroid - central

      • TF timing now ok

      • Needs a small amount of FPGA work

    • A.C scintillator - c+n+s

      • Ready to go but region triggers better for studies

    • A.C scintillator.PDT - central

    • Dimuon A.C - central

      • Needs FPGA work

    • Dimuon A.C - c+n+s

    • Muon + Jet - c


L1mu status1
L1MU Status

  • Work in progress

    • Developing L1MU examine

      • Highest priority

      • Real messages implemented in hardware

    • Tracking down Muon FE - L1MU interface problems

      • Scope signals from L1MU are used to debug what the FE’s are sending

    • Understanding muon octant trigger rates

      • Some high rates due to hot counters

      • Others due to SFE or MTCxx electronics

    • Verifying that the Muon FE systems are timed in to the correct BC

      • By beam delay rate curves using collisions

      • By pulser triggers

    • Understanding and fixing L1MU MTCxx problems

    • Missing L1MU (and Muon) readout crates traced to spurious interrupts in MFC card

    • Completing software connection to COOR

    • Starting work on L1MU monitoring gui’s

    • Increasing sophistication of triggers

    • Continuing development of tsim_l1muo



L1mu decision time
L1MU Decision Time

All are < 3.3 ms (TF decision time)

Does not include full trigger algorithms,

MCON, or MCEN cards

Results are encouraging but that doesn’t

mean we won’t be screaming for every

last ns at the end




Sfe timing
SFE Timing

Use L1MU trigger rate to select which

BC SFE’s send as BC #7

There is still some uncertainty given

our less-than-perfect understanding of

the SFE card.


Access tasks
Access Tasks

  • Identify and fix bad channels

  • Implement control FPGA changes as needed

  • Install remaining “05” and “10” MTCxx cards

  • Test MCCM-MRC connection

  • Test MCON card


Shutdown tasks
Shutdown Tasks

  • Complete L1MU cabling (20% left)

  • Complete MCEN cabling (80% left)

  • Complete MCEN commissioning

  • Complete L1CFT-L1MU commissioning