GWS SMS INTRODUCTION. MTM Manual. 4.4 Critical Equipment - Maintenance.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about ' GWS SMS INTRODUCTION' - minna


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript

4 4 critical equipment maintenance
4.4 Critical Equipment - Maintenance

  • 4.4.1 If routine maintenance is required to be carried out on Critical Equipment, the Staff must carry out a Risk Assessment and forward the assessment to the Office. Only on approval from the Office can the Equipment be taken “Out of Service”. If approval is received on phone, a confirmatory email must be sent.

  • Critical equipment work permit F-S-0619 must be completed

    • 4.7 GENERIC CRITICAL EQUIPMENT LIST


9 1 2 operation of m e at low loads
9.1.2 Operation Of M/E At Low Loads

  • When the engine has to be operated for a prolonged period of time (longer than 2 hours) at less than 20% nominal power, kindly refer to MTM section 9.1.2 for complete details.


Annex 1 guidelines on planned maintenance schedules
Annex 1 Guidelines On Planned Maintenance Schedules

  • The list requires to be elaborated to accommodate all units of equipment and / or all similar equipment for various services in consultation with Supdt to make it ship specific.

  • Intervals are to be reviewed as per maker’s instruction / condition warranting reduce the time between overhauling / deferring overhauls

  • Master / Chief Engr. may re-assign the responsibilities and wherever shore workshop is required the Supdt. must be notified well in advance.