An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MarComMaritime Navigation Commission Chairman MarCom Geoffroy Caude (France) Secretary MarCom Wim Verhagen (The Netherlands) U.S. Representative E.Dan Allen (Long Beach, CA)

  2. Commission Member’s Countries Belgium Germany Spain Denmark Italy Sweden Finland Japan UK France Norway USA The Netherlands

  3. Active Working Groups #42 Implementation Manual for Life Heffron Cycle Management of Port Struc. –being published, expect anytime #43 Minimizing Harbor Siltation - Headland at HQ to publish; expect end of yr #47 Criteria for the Selection of Melby Breakwater Types – analysis and report in process

  4. Active Working Groups #48 Guidelines for Port Construction HermansRelated to Bow Thrusters – final draft for review expected 10/09 #49Vertical + Horizontal Dimensions Briggs of Fairways #50 General Principles for the DesignPararisof Maritime Structures – proceeding #51 Water Injection Dredging – Welpproceeding

  5. #52 Criteria for the (Un)loading of Allen Container Ships Develop acceptable level of ship motionbefore operations are impacted (a challenge) • Report draft in process • Questionnaire to industry in process with disappointing level of response so far • Expect report complete in 2009

  6. Active Working Groups #53 Recommendations with Regard Headland to the Design and Construction of Maritime Structures in Tsunami Prone Areas – partly done but slow #54 Use of Hydrometeo Information Weeks to Optimize Safe Port Access – proceeding

  7. Active Working Groups #55 Safety Aspects of Berthing Cunningham/Wise Operations of Oil & Gas Tankers – proceeding slowly so far #56 Application of Geotextiles in Gaffney Waterfront Protection #57 Stability of Pattern Placed Boshek Revetment Elements – proceeding slowly

  8. SPECIAL ACTIVITIES PIANC Dictionary H.J. Verhagen

  9. PROPOSED WORKING GROUPS • Design Principles for Cont. Terminals • Guidelines for Design of Specialized Terminals • Guidelines for Cruise Terminals & Facilities • Classification of Rocks & Soils to be Dredged

  10. PROPOSED WORKING GROUPS • Design Manual on Hydraulic Fills • Berthing Velocities & Fender Design • Coastal Structures Asset Management