An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MP7 link fault 18/8/2011 Davide Bozzini, 19th of August 2011

  2. SPS power network consolidation

  3. Nature of works

  4. Crossing points and trial holes

  5. Crossing points and trial holes • Trial holes shall be done whenever necessary to exactly localize the crossing known and unknown utilities • Trial holes shall provide information on the nature of the ground for excavating and timbering purposes • All known crossing points shall be confirmed by a trial hole • CERN known crossing points are shown in each concerned work package set of drawings • The contractor shall identify any crossed utility before starting digging

  6. Nature of fault • Damage of a 18 kV power cable during excavation • The trial hole was done during the TS to exactly determine position and depth • Excavation to be done durin machine operation according to work status

  7. Preliminary outcome • The trial hole was done during the TS to exactly determine position and depth • Excavation to be done during machine operation according to work status • BA2 18 networks crossed without any problem. Excellent execution • Today accident: • Operators ad-interim to cope with staff holidays • Supervisors absent during the accident 11h45 • HSE unit inspection on site today Friday morning • Setting up of the fact finding group to be confirmed by DG • Trial holes and crossing works suspended • Normal operation of network expected by tonight